Reconstruction of the DW 685 section of Zabłudów (DK 19) — Municipality of Zabłudów (Q88482): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The project involves the construction of the DW 685 extension together with engineering structures and the necessary technical infrastructure over the length of around8.4 km from km 0 + 060,5 (limit of the DK 19 lane as TEN-T) to km 8 + 462.The activity is entirely located in the powiat białostocki in the municipality of Zabłudów (ITI BoF area) as it is mainly located in non-urban areas (plain line), except for the initial length approximately1 ...)
Property / summary
 
The project involves the construction of the DW 685 extension together with engineering structures and the necessary technical infrastructure over the length of around8.4 km from km 0 + 060,5 (limit of the DK 19 lane as TEN-T) to km 8 + 462.The activity is entirely located in the powiat białostocki in the municipality of Zabłudów (ITI BoF area) as it is mainly located in non-urban areas (plain line), except for the initial length approximately1 km in the city area of Zabłudów (street or semi-street).The width of the road is in the vast majority of 6 m;only in Zabrze is up to 9 m higher and the technical parameters of the road deviate from the prescriptive requirements, which adversely affects the liquidity and safety of the traffic, leads to negative environmental impacts.The journey time is also extended to include:extending the road to 7.0 m to reinforce the pavement (up to 115 kN) by adjusting the geometry of the path for cycling along the walkways to the upgrading of engineering structures (culverts) for the construction of technical canal lighting (penetrations) of the technical channel for the upgrading of the conflicting facilities and other product products of the Project:reconstruction of the regional roads with a length of 8.4 km;the number of road transport projects 1 is a public road that guarantees equal and unrestricted access for all its users. the project will be accessible on an equal basis to all road users.The main users will be the residents of the BoF, in particular the municipalities of Zabłudów and the population of the Haitian district including students (DW 685 is part of the main service route from Hajnówka/Bialowieza to Białystok).The route will be used intensively by entrepreneurs in connection with their economic activities, students, tourists from the country and the rest of the world visiting the Białowieża, investors, emergency services. (English)
Property / summary: The project involves the construction of the DW 685 extension together with engineering structures and the necessary technical infrastructure over the length of around8.4 km from km 0 + 060,5 (limit of the DK 19 lane as TEN-T) to km 8 + 462.The activity is entirely located in the powiat białostocki in the municipality of Zabłudów (ITI BoF area) as it is mainly located in non-urban areas (plain line), except for the initial length approximately1 km in the city area of Zabłudów (street or semi-street).The width of the road is in the vast majority of 6 m;only in Zabrze is up to 9 m higher and the technical parameters of the road deviate from the prescriptive requirements, which adversely affects the liquidity and safety of the traffic, leads to negative environmental impacts.The journey time is also extended to include:extending the road to 7.0 m to reinforce the pavement (up to 115 kN) by adjusting the geometry of the path for cycling along the walkways to the upgrading of engineering structures (culverts) for the construction of technical canal lighting (penetrations) of the technical channel for the upgrading of the conflicting facilities and other product products of the Project:reconstruction of the regional roads with a length of 8.4 km;the number of road transport projects 1 is a public road that guarantees equal and unrestricted access for all its users. the project will be accessible on an equal basis to all road users.The main users will be the residents of the BoF, in particular the municipalities of Zabłudów and the population of the Haitian district including students (DW 685 is part of the main service route from Hajnówka/Bialowieza to Białystok).The route will be used intensively by entrepreneurs in connection with their economic activities, students, tourists from the country and the rest of the world visiting the Białowieża, investors, emergency services. (English) / rank
 
Normal rank

Revision as of 10:37, 4 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the DW 685 section of Zabłudów (DK 19) — Municipality of Zabłudów
Project in Poland financed by DG Regio

    Statements

    0 references
    44,602,468.44 zloty
    0 references
    10,704,592.4256 Euro
    13 January 2020
    0 references
    52,473,492.31 zloty
    0 references
    12,593,638.1544 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    31 July 2017
    0 references
    20 September 2019
    0 references
    WOJEWÓDZTWO PODLASKIE
    0 references
    Projekt obejmuje budowę z rozbudową DW 685 wraz z obiektami inżynierskimi i niezbędną infrastrukturą techniczną na odcinku o długości ok. 8,4 km od km 0+060,5 (granica pasa DK 19 jako TEN-T) do km 8+462. Zadanie w całości zlokalizowane jest w powiecie białostockim na terenie gminy Zabłudów (obszar ZIT BOF) Trasa przebiega głównie w terenie niezabudowanym (przekrój szlakowy), za wyjątkiem początkowego odcinka o długości ok. 1 km na obszarze miasta Zabłudów (uliczny lub półuliczny). Szerokość jezdni wynosi w zdecydowanej większości 6 m; jedynie w Zabłudowie jest większa i lokalnie dochodzi nawet do 9 m. Parametry techniczne drogi odbiegają od wymagań normatywnych, co negatywne wpływa na płynność i bezpieczeństwo ruchu, wzmaga negatywne oddziaływania środowiskowe. Wydłużony jest też czas podróży Zakres inwestycji obejmuje: poszerzenie jezdni do 7,0m wzmocnienie nawierzchni (do 115 kN) korektę geometrii budowę ciągu rowerowego wzdłuż trasy chodników przebudowę skrzyżowań przebudowę obiektów inżynierskich (przepusty) budowę oświetlenia kanału tech. przebudowę kolidujących urządzeń obcych i inne Produkty Projektu: przebudowa dróg wojewódzkich o długości 8,4 km; liczba projektów z zakresu transportu drogowego szt.1 Publiczny charakter drogi gwarantuje równy i nieograniczony dostęp dla wszystkich jej użytkowników Projekt dostępny będzie na równych zasadach dla wszystkich użytkowników dróg. Głównymi jego użytkownikami będą mieszkańcy BOF, przede wszystkim gminy Zabłudów i ludność powiatu hajnowskiego w tym studenci (DW 685 stanowi element głównej trasy dojazdowej z Hajnówki/Białowieży do Białegostoku). Trasa intensywnie wykorzystywana będzie przez przedsiębiorców w związku z prowadzoną działalnością gospodarczą, studentów, turystów z kraju i zagranicy odwiedzających Białowieżę, inwestorów, służby ratunkowe (Polish)
    0 references
    The project involves the construction of the DW 685 extension together with engineering structures and the necessary technical infrastructure over the length of around8.4 km from km 0 + 060,5 (limit of the DK 19 lane as TEN-T) to km 8 + 462.The activity is entirely located in the powiat białostocki in the municipality of Zabłudów (ITI BoF area) as it is mainly located in non-urban areas (plain line), except for the initial length approximately1 km in the city area of Zabłudów (street or semi-street).The width of the road is in the vast majority of 6 m;only in Zabrze is up to 9 m higher and the technical parameters of the road deviate from the prescriptive requirements, which adversely affects the liquidity and safety of the traffic, leads to negative environmental impacts.The journey time is also extended to include:extending the road to 7.0 m to reinforce the pavement (up to 115 kN) by adjusting the geometry of the path for cycling along the walkways to the upgrading of engineering structures (culverts) for the construction of technical canal lighting (penetrations) of the technical channel for the upgrading of the conflicting facilities and other product products of the Project:reconstruction of the regional roads with a length of 8.4 km;the number of road transport projects 1 is a public road that guarantees equal and unrestricted access for all its users. the project will be accessible on an equal basis to all road users.The main users will be the residents of the BoF, in particular the municipalities of Zabłudów and the population of the Haitian district including students (DW 685 is part of the main service route from Hajnówka/Bialowieza to Białystok).The route will be used intensively by entrepreneurs in connection with their economic activities, students, tourists from the country and the rest of the world visiting the Białowieża, investors, emergency services. (English)
    0 references

    Identifiers

    POPW.02.02.00-20-0003/17
    0 references