The drainage of the City of Łódź (Q85082): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The purpose of the project “drainage from the City of Łódź” is to increase the quantity of water being preserved, to improve the quality of the water pre-treatment and to improve the efficiency of the management of rainwater and mites in Łódź.The project in question will be carried out in the city of Łódź, located in the municipality of Łódź, Łódzkie Province, Łódzkie Province. the project is designed to carry out the following tasks:Task 1:Cons...)
Property / summary
 
The purpose of the project “drainage from the City of Łódź” is to increase the quantity of water being preserved, to improve the quality of the water pre-treatment and to improve the efficiency of the management of rainwater and mites in Łódź.The project in question will be carried out in the city of Łódź, located in the municipality of Łódź, Łódzkie Province, Łódzkie Province. the project is designed to carry out the following tasks:Task 1:Construction work:cost q1PLN 32 079 638,73 net Zadanie 1.1 — Construction of a rainwater collector at ul.Zygmunt (from ul.Columns to the river Olchówka).Activity 1.2 — Construction of a rainwater collector at ul.Pomorska, ul.Miluszki and ul.Frezjon Zadanie 1.3 — Construction of a rainwater collector at ul.Call 1.4 — Reconstruction of the rain collector in ul.Stogynku Zadanie 1.5 — Construction of a septic tank for the rainwater drain to the receiver (ul. Łagiewock) -1.6 — Construction of a settling sludge on the drain of the rainwater collector to the receiver (ul.Krakowska) Zadanie 1.7 — Construction of a settling sludge collector into the receiver of the storm (ul.Constantinowska) -1.8 — Construction of a settling sludge collector into the receiver of the storm (ul.Konstantinowska) -1.9 — Construction of a settling sludge on the drain of the rainwater canal to a receiver (ul.Pabianicka) -1.10 — Construction of the ‘Strykowska’ bringing the ‘Strykowska’ to the Łódź river, Task 1.11 — Upgrading of the pre-treatment of rainwater at ul.Hardwood 1.12 — Construction of a retention reservoir in the area ul.Pomorskie Task 1.13 — Construction of the reservoir for the Ner River in the area ul.Frezjon Zadanie 1.14 — Construction of the reservoir for the Ner River in the area ul.Solecka Zadanie 1.15 — Construction of a retention reservoir in the area ul.Pomorskie/Milekis Zadanie 2:Construction supervision:cost q1PLN 801 990,96: assignment 3:Information and cost promotionPLN 24 593,58: assignment 4:Project managementPLN 809 875,00 (English)
Property / summary: The purpose of the project “drainage from the City of Łódź” is to increase the quantity of water being preserved, to improve the quality of the water pre-treatment and to improve the efficiency of the management of rainwater and mites in Łódź.The project in question will be carried out in the city of Łódź, located in the municipality of Łódź, Łódzkie Province, Łódzkie Province. the project is designed to carry out the following tasks:Task 1:Construction work:cost q1PLN 32 079 638,73 net Zadanie 1.1 — Construction of a rainwater collector at ul.Zygmunt (from ul.Columns to the river Olchówka).Activity 1.2 — Construction of a rainwater collector at ul.Pomorska, ul.Miluszki and ul.Frezjon Zadanie 1.3 — Construction of a rainwater collector at ul.Call 1.4 — Reconstruction of the rain collector in ul.Stogynku Zadanie 1.5 — Construction of a septic tank for the rainwater drain to the receiver (ul. Łagiewock) -1.6 — Construction of a settling sludge on the drain of the rainwater collector to the receiver (ul.Krakowska) Zadanie 1.7 — Construction of a settling sludge collector into the receiver of the storm (ul.Constantinowska) -1.8 — Construction of a settling sludge collector into the receiver of the storm (ul.Konstantinowska) -1.9 — Construction of a settling sludge on the drain of the rainwater canal to a receiver (ul.Pabianicka) -1.10 — Construction of the ‘Strykowska’ bringing the ‘Strykowska’ to the Łódź river, Task 1.11 — Upgrading of the pre-treatment of rainwater at ul.Hardwood 1.12 — Construction of a retention reservoir in the area ul.Pomorskie Task 1.13 — Construction of the reservoir for the Ner River in the area ul.Frezjon Zadanie 1.14 — Construction of the reservoir for the Ner River in the area ul.Solecka Zadanie 1.15 — Construction of a retention reservoir in the area ul.Pomorskie/Milekis Zadanie 2:Construction supervision:cost q1PLN 801 990,96: assignment 3:Information and cost promotionPLN 24 593,58: assignment 4:Project managementPLN 809 875,00 (English) / rank
 
Normal rank

Revision as of 10:04, 4 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
The drainage of the City of Łódź
Project in Poland financed by DG Regio

    Statements

    0 references
    29,188,737.38 zloty
    0 references
    7,005,296.9712 Euro
    13 January 2020
    0 references
    43,758,003.64 zloty
    0 references
    10,501,920.8736 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 June 2019
    0 references
    31 December 2022
    0 references
    MIASTO ŁÓDŹ
    0 references
    Celem Projektu "Odwodnienie Miasta Łodzi" jest Zwiększenie ilości retencjonowanej wody, poprawa jakości podczyszczonych wód deszczowych oraz poprawa efektywności zarządzania wodami opadowymi i roztopowymi w Łodzi. Omawiany Projekt będzie realizowany w mieście Łódź, zlokalizowanym w gminie Łódź, powiecie łódzkim, województwie łódzkim W ramach projektu zaplanowano realizację następujących zadań: Zadanie 1: Roboty Budowlane: koszt kw. 32 079 638,73 zł netto Zadanie 1.1 - Budowa kolektora deszczowego w ul. Zygmunta (na odcinku od ul. Kolumny do rzeki Olchówki). Zadanie 1.2 - Budowa kolektora deszczowego w ul. Pomorskiej, ul. Mileszki i w ul. Frezjowej Zadanie 1.3 - Budowa kolektora deszczowego w ul. Telefonicznej Zadanie 1.4 - Przebudowa kolektora deszczowego w ul. Starogardzkiej Zadanie 1.5 - Budowa osadnika na odpływie kanału deszczowego do odbiornika (ul Łagiewnicka) Zadanie 1.6 - Budowa osadnika na odpływie kanału deszczowego do odbiornika (ul. Krakowska) Zadanie 1.7 - Budowa osadnika na odpływie kanału deszczowego do odbiornika (ul. Konstantynowska) Zadanie 1.8 - Budowa osadnika na odpływie kanału deszczowego do odbiornika (ul.Konstantynowska) Zadanie 1.9 - Budowa osadnika na odpływie kanału deszczowego do odbiornika (ul. Pabianicka) Zadanie 1.10 - Budowa zbiornika-osadnika "Strykowska" na rzece Łódce w Łodzi Zadanie 1.11 - Modernizacja podczyszczalni wód deszczowych przy ul. Liściastej Zadanie 1.12 - Budowa zbiornika retencyjnego w rejonie ul. Pomorskiej Zadanie 1.13 - Budowa zbiornika retencyjnego przy rzece Ner w rejonie ul. Frezjowej Zadanie 1.14 - Budowa zbiornika retencyjnego przy rzece Ner w rejonie ul. Sołeckiej Zadanie 1.15 - Budowa zbiornika retencyjnego w rejonie ul. Pomorskiej/Mileszki Zadanie 2: Nadzór budowlany: koszt kw. 801 990,96 zł Zadanie 3: Informacja i Promocja koszt kw. 24 593,58 zł Zadanie 4: Zarządzanie Projektem koszt kw. 809 875,00 zł (Polish)
    0 references
    The purpose of the project “drainage from the City of Łódź” is to increase the quantity of water being preserved, to improve the quality of the water pre-treatment and to improve the efficiency of the management of rainwater and mites in Łódź.The project in question will be carried out in the city of Łódź, located in the municipality of Łódź, Łódzkie Province, Łódzkie Province. the project is designed to carry out the following tasks:Task 1:Construction work:cost q1PLN 32 079 638,73 net Zadanie 1.1 — Construction of a rainwater collector at ul.Zygmunt (from ul.Columns to the river Olchówka).Activity 1.2 — Construction of a rainwater collector at ul.Pomorska, ul.Miluszki and ul.Frezjon Zadanie 1.3 — Construction of a rainwater collector at ul.Call 1.4 — Reconstruction of the rain collector in ul.Stogynku Zadanie 1.5 — Construction of a septic tank for the rainwater drain to the receiver (ul. Łagiewock) -1.6 — Construction of a settling sludge on the drain of the rainwater collector to the receiver (ul.Krakowska) Zadanie 1.7 — Construction of a settling sludge collector into the receiver of the storm (ul.Constantinowska) -1.8 — Construction of a settling sludge collector into the receiver of the storm (ul.Konstantinowska) -1.9 — Construction of a settling sludge on the drain of the rainwater canal to a receiver (ul.Pabianicka) -1.10 — Construction of the ‘Strykowska’ bringing the ‘Strykowska’ to the Łódź river, Task 1.11 — Upgrading of the pre-treatment of rainwater at ul.Hardwood 1.12 — Construction of a retention reservoir in the area ul.Pomorskie Task 1.13 — Construction of the reservoir for the Ner River in the area ul.Frezjon Zadanie 1.14 — Construction of the reservoir for the Ner River in the area ul.Solecka Zadanie 1.15 — Construction of a retention reservoir in the area ul.Pomorskie/Milekis Zadanie 2:Construction supervision:cost q1PLN 801 990,96: assignment 3:Information and cost promotionPLN 24 593,58: assignment 4:Project managementPLN 809 875,00 (English)
    0 references