Tworóg-Tworzeń pipeline (Q86134): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, e...) |
||
Property / summary | |||
The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, energy connections. (English) | |||
Property / summary: The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, energy connections. (English) / rank | |||
Normal rank |
Revision as of 10:18, 4 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Tworóg-Tworzeń pipeline |
Project in Poland financed by DG Regio |
Statements
218,673,195.0 zloty
0 references
1 January 2014
0 references
30 September 2021
0 references
OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
0 references
Przedmiotem projektu jest budowa gazociągu DN1000 MOP 8,4MPa o długości 55 km na odcinku od projektowanego węzła Tworóg (realizowanego w ramach projektu Kędzierzyn – Tworóg: województwo śląskie, powiat tarnogórski) do zespołu zaporowo - upustowego Tworzeń (województwo śląskie, miasto Dąbrowa Górnicza) wraz z infrastrukturą: 5 zespołów zaporowo-upustowych na trasie gazociągu, urządzenia ochrony katodowej, system łączności i sterowania – linia światłowodowa, przyłącza energetyczne. (Polish)
0 references
The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, energy connections. (English)
0 references
Identifiers
POIS.07.01.00-00-0016/17
0 references