Hermanowice Strachocina gas pipeline (Q86102): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): The project involves the construction of the gas pipeline Hermanowice-Strachocina.The project is located in the municipalities of Sanok, Tyrawa Wołoska, Dona, Bircza, Fredropol, Przemyśl, Lower Silesia (Podkarpackie Province).The project envisages the following projects:construction of the Hermanowice — Strachocina pipeline with the following parameters:nominal diameter:700 mm, pressure robocze:8,4 MPa, pipeline length:L = 71.7 km, as well as:th...) |
||
Property / summary | |||
The project involves the construction of the gas pipeline Hermanowice-Strachocina.The project is located in the municipalities of Sanok, Tyrawa Wołoska, Dona, Bircza, Fredropol, Przemyśl, Lower Silesia (Podkarpackie Province).The project envisages the following projects:construction of the Hermanowice — Strachocina pipeline with the following parameters:nominal diameter:700 mm, pressure robocze:8,4 MPa, pipeline length:L = 71.7 km, as well as:the five block forces, the bleed system, the connection system to the Hermanowice interchange, the regulating/reducing and measuring system at the Hermanowice section of the Hermanowice junction, the receiver of the piston in the Hermanowice hub, the systems, the cathode protection system, including the cathode ray protection station and the power supply (AKP) stations, together with the connections. (English) | |||
Property / summary: The project involves the construction of the gas pipeline Hermanowice-Strachocina.The project is located in the municipalities of Sanok, Tyrawa Wołoska, Dona, Bircza, Fredropol, Przemyśl, Lower Silesia (Podkarpackie Province).The project envisages the following projects:construction of the Hermanowice — Strachocina pipeline with the following parameters:nominal diameter:700 mm, pressure robocze:8,4 MPa, pipeline length:L = 71.7 km, as well as:the five block forces, the bleed system, the connection system to the Hermanowice interchange, the regulating/reducing and measuring system at the Hermanowice section of the Hermanowice junction, the receiver of the piston in the Hermanowice hub, the systems, the cathode protection system, including the cathode ray protection station and the power supply (AKP) stations, together with the connections. (English) / rank | |||
Normal rank |
Revision as of 10:18, 4 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Hermanowice Strachocina gas pipeline |
Project in Poland financed by DG Regio |
Statements
146,210,751.0 zloty
0 references
349,081,062.68 zloty
0 references
54.64 percent
0 references
1 January 2014
0 references
31 December 2020
0 references
OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
0 references
Przedmiotem Projektu jest budowa gazociągu Hermanowice-Strachocina. Projekt jest zlokalizowany na terenie gmin Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne należących do województwa podkarpackiego. W ramach Projektu przewiduje się realizację następujących przedsięwzięć: budowa gazociągu Hermanowice - Strachocina o następujących parametrach: średnica nominalna: 700 mm, ciśnienie robocze:8,4 MPa, długość gazociągu: L= 71,7 km, a także: pięciu zespołów zaporowo – upustowych, układu przyłączeniowego do węzła Hermanowice, układu regulacyjnego/redukcyjnego i pomiarowego na terenie węzła Hermanowice, śluzy nadawczo – odbiorczej tłoka na terenie węzła Hermanowice, układów, systemu ochrony katodowej, w tym stacji ochrony katodowej oraz układów zasilania (AKPiA) elektroenergetycznego wraz z przyłączami. (Polish)
0 references
The project involves the construction of the gas pipeline Hermanowice-Strachocina.The project is located in the municipalities of Sanok, Tyrawa Wołoska, Dona, Bircza, Fredropol, Przemyśl, Lower Silesia (Podkarpackie Province).The project envisages the following projects:construction of the Hermanowice — Strachocina pipeline with the following parameters:nominal diameter:700 mm, pressure robocze:8,4 MPa, pipeline length:L = 71.7 km, as well as:the five block forces, the bleed system, the connection system to the Hermanowice interchange, the regulating/reducing and measuring system at the Hermanowice section of the Hermanowice junction, the receiver of the piston in the Hermanowice hub, the systems, the cathode protection system, including the cathode ray protection station and the power supply (AKP) stations, together with the connections. (English)
0 references
Identifiers
POIS.07.01.00-00-0002/16
0 references