(‎Created claim: summary (P836): The building’s total useful floor area is 22 727.5 m².The building is used by some 870 staff.The main objective of the project is to improve air quality in the city of Warsaw by reducing atmospheric pollution and improving the energy efficiency of the building.This objective will be met by:1.The efficient use of thermal energy.2.A reduction in the cost of heating plants.3.Improving the conditions for the use of public utilities.As a result of th...)
Property / summary
 
The building’s total useful floor area is 22 727.5 m².The building is used by some 870 staff.The main objective of the project is to improve air quality in the city of Warsaw by reducing atmospheric pollution and improving the energy efficiency of the building.This objective will be met by:1.The efficient use of thermal energy.2.A reduction in the cost of heating plants.3.Improving the conditions for the use of public utilities.As a result of the investment, energy efficiency will be improved, the annual energy demand used for heating and the preparation of hot water will be reduced.Improving energy efficiency will result in generating savings in the operating costs of the building.The deep and comprehensive renovation of the Ministry of Development’s building means a project to improve the energy efficiency of a building which aims to improve energy efficiency with a view to reducing energy losses by:— retrofit of ventilation systems in conference rooms A, B, C and D (including the replacement of the existing clay recuperator with a typical anti-current recuperator with high efficiency) — the ceiling warming above the crossing over the building’s ground floor, — the insulation of the IV floor ceiling, — comprehensive modernisation of the installation of c.o, — comprehensive modernisation of the hot-water installations — replacement of window frames, — modernisation of lighting. (English)
Property / summary: The building’s total useful floor area is 22 727.5 m².The building is used by some 870 staff.The main objective of the project is to improve air quality in the city of Warsaw by reducing atmospheric pollution and improving the energy efficiency of the building.This objective will be met by:1.The efficient use of thermal energy.2.A reduction in the cost of heating plants.3.Improving the conditions for the use of public utilities.As a result of the investment, energy efficiency will be improved, the annual energy demand used for heating and the preparation of hot water will be reduced.Improving energy efficiency will result in generating savings in the operating costs of the building.The deep and comprehensive renovation of the Ministry of Development’s building means a project to improve the energy efficiency of a building which aims to improve energy efficiency with a view to reducing energy losses by:— retrofit of ventilation systems in conference rooms A, B, C and D (including the replacement of the existing clay recuperator with a typical anti-current recuperator with high efficiency) — the ceiling warming above the crossing over the building’s ground floor, — the insulation of the IV floor ceiling, — comprehensive modernisation of the installation of c.o, — comprehensive modernisation of the hot-water installations — replacement of window frames, — modernisation of lighting. (English) / rank
 
Normal rank

Revision as of 09:46, 4 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy efficiency improvement of the Ministry of Enterprise and Technology building at the Plac Trzech Krzyży 3/5 in Warsaw
Project in Poland financed by DG Regio

    Statements

    0 references
    16,544,466.92 zloty
    0 references
    3,970,672.0607999996 Euro
    13 January 2020
    0 references
    19,718,446.69 zloty
    0 references
    4,732,427.2056 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 April 2016
    0 references
    30 September 2022
    0 references
    MINISTERSTWO PRZEDSIĘBIORCZOŚCI I TECHNOLOGII
    0 references
    Łączna powierzchnia użytkowa budynku wynosi 22 727,5 m2. Budynek jest użytkowany przez około 870 pracowników. Celem głównym projektu jest poprawa jakości powietrza na terenie miasta stołecznego Warszawy poprzez redukcję zanieczyszczeń emitowanych do atmosfery i zwiększenie efektywności energetycznej budynku. Cel ten zostanie zrealizowany poprzez: 1. Efektywne wykorzystanie energii cieplnej. 2. Obniżenie kosztów ogrzewania obiektów. 3. Poprawę warunków użytkowania obiektów użyteczności publicznej. W wyniku realizacji inwestycji nastąpi poprawa efektywności energetycznej, zmniejszenie rocznego zapotrzebowania na energię zużywaną na potrzeby grzewcze oraz przygotowanie ciepłej wody użytkowej. Poprawa efektywności energetycznej będzie skutkować wygenerowaniem oszczędności w kosztach eksploatacyjnych budynku. Głęboka, kompleksowa termomodernizacja budynku Ministerstwa Rozwoju oznacza przedsięwzięcie wpływające na poprawę efektywności energetycznej budynku, którego przedmiotem jest ulepszenie mające na celu ograniczenie strat energii poprzez: - modernizacje układu wentylacji w salach konferencyjnych A, B, C i D (w tym zastąpienie istniejącego rekuperatora glikolowego typowym rekuperatorem przeciwprądowym o wysokiej sprawności) - ocieplenie stropu nad przejazdami o podcieniami nad parterem budynku, - ocieplenie stropu IV kondygnacji, - kompleksowa modernizacja instalacji c.o, - kompleksowa modernizacja instalacji c.w.u., - wymiana stolarki okiennej, - modernizacja oświetlenia. (Polish)
    0 references
    The building’s total useful floor area is 22 727.5 m².The building is used by some 870 staff.The main objective of the project is to improve air quality in the city of Warsaw by reducing atmospheric pollution and improving the energy efficiency of the building.This objective will be met by:1.The efficient use of thermal energy.2.A reduction in the cost of heating plants.3.Improving the conditions for the use of public utilities.As a result of the investment, energy efficiency will be improved, the annual energy demand used for heating and the preparation of hot water will be reduced.Improving energy efficiency will result in generating savings in the operating costs of the building.The deep and comprehensive renovation of the Ministry of Development’s building means a project to improve the energy efficiency of a building which aims to improve energy efficiency with a view to reducing energy losses by:— retrofit of ventilation systems in conference rooms A, B, C and D (including the replacement of the existing clay recuperator with a typical anti-current recuperator with high efficiency) — the ceiling warming above the crossing over the building’s ground floor, — the insulation of the IV floor ceiling, — comprehensive modernisation of the installation of c.o, — comprehensive modernisation of the hot-water installations — replacement of window frames, — modernisation of lighting. (English)
    0 references

    Identifiers

    POIS.01.03.01-00-0127/16