Modernisation of the urban heating plant in Zambrów in order to use biomass (Q84407): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The project concerns the extension of an existing combustion plant with one heat generator, a biomass boiler.The project shall consist of the execution of:• an aquatic biomass boiler with a capacity of 8 MW with installations, cooperating devices;• the upgrading of district heating installations and control systems;• System of fuel delivery with magnesium and equipment;• stack;• the connection of the source to the transmission network, i.e. the...)
Property / summary
 
The project concerns the extension of an existing combustion plant with one heat generator, a biomass boiler.The project shall consist of the execution of:• an aquatic biomass boiler with a capacity of 8 MW with installations, cooperating devices;• the upgrading of district heating installations and control systems;• System of fuel delivery with magnesium and equipment;• stack;• the connection of the source to the transmission network, i.e. the municipal district heating network.Two circulating pumps are provided for the boiler, one basic, the other as a back-up pump.Heat production — according to the temperature table:The heating season — 137/70 °C — summer season 70/42 °C. all the thermal energy produced will be used in the urbanised area of the town of Zambrowa. (English)
Property / summary: The project concerns the extension of an existing combustion plant with one heat generator, a biomass boiler.The project shall consist of the execution of:• an aquatic biomass boiler with a capacity of 8 MW with installations, cooperating devices;• the upgrading of district heating installations and control systems;• System of fuel delivery with magnesium and equipment;• stack;• the connection of the source to the transmission network, i.e. the municipal district heating network.Two circulating pumps are provided for the boiler, one basic, the other as a back-up pump.Heat production — according to the temperature table:The heating season — 137/70 °C — summer season 70/42 °C. all the thermal energy produced will be used in the urbanised area of the town of Zambrowa. (English) / rank
 
Normal rank

Revision as of 09:38, 4 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of the urban heating plant in Zambrów in order to use biomass
Project in Poland financed by DG Regio

    Statements

    0 references
    6,057,600.0 zloty
    0 references
    1,453,824.0 Euro
    13 January 2020
    0 references
    17,472,150.0 zloty
    0 references
    4,193,316.0 Euro
    13 January 2020
    0 references
    42.66 percent
    0 references
    29 December 2017
    0 references
    31 December 2020
    0 references
    ZAMBROWSKIE CIEPŁOWNICTWO I WODOCIĄGI SP.Z O.O.
    0 references
    Projekt dotyczy rozbudowy istniejącej instalacji energetycznego spalania o jedno źródło ciepła – kocioł wodny opalany biomasą. Przedsięwzięcie obejmuje wykonanie: • kotła wodnego na biomasę leśną o mocy 8 MW z instalacjami, urządzeniami współpracującymi; • modernizacji instalacji i układów sterowania ciepłowni; • systemu podawania paliwa z magnezem i sprzętem; • komina; • podłączenie źródła do sieci przesyłowej, tj. miejskiej sieci ciepłowniczej. Do kotła przewidziano dwie pompy obiegowe – jedna podstawowa, druga jako pompa rezerwowa. Produkcja ciepła – zgodnie z tabelą temperatur: - sezon grzewczy – 137/70 °C - sezon letni 70/42 ° C. Całość wytworzonej energii cieplnej będzie wykorzystywana na zurbanizowanym obszarze miasta Zambrowa. (Polish)
    0 references
    The project concerns the extension of an existing combustion plant with one heat generator, a biomass boiler.The project shall consist of the execution of:• an aquatic biomass boiler with a capacity of 8 MW with installations, cooperating devices;• the upgrading of district heating installations and control systems;• System of fuel delivery with magnesium and equipment;• stack;• the connection of the source to the transmission network, i.e. the municipal district heating network.Two circulating pumps are provided for the boiler, one basic, the other as a back-up pump.Heat production — according to the temperature table:The heating season — 137/70 °C — summer season 70/42 °C. all the thermal energy produced will be used in the urbanised area of the town of Zambrowa. (English)
    0 references

    Identifiers

    POIS.01.01.01-00-0027/17
    0 references