III/49016 road: Zlin, bridge ev.No. 49016-2 (Q74880): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The purpose of the project is the reconstruction of the bridge between 49016 and 2 (in the case of the bus station), including the communication on it and the III/49016 road in the 2- hub, respectively km 0,205-0,659. The total length of the construction of the road III/49016, including the bridge, is 454 m, of which bridge length is 196.6 m, incl. transitional sections 206 m., Adding English summary)
Property / summary
 
The purpose of the project is the reconstruction of the bridge between 49016 and 2 (in the case of the bus station), including the communication on it and the III/49016 road in the 2- hub, respectively km 0,205-0,659. The total length of the construction of the road III/49016, including the bridge, is 454 m, of which bridge length is 196.6 m, incl. transitional sections 206 m. (English)
Property / summary: The purpose of the project is the reconstruction of the bridge between 49016 and 2 (in the case of the bus station), including the communication on it and the III/49016 road in the 2- hub, respectively km 0,205-0,659. The total length of the construction of the road III/49016, including the bridge, is 454 m, of which bridge length is 196.6 m, incl. transitional sections 206 m. (English) / rank
 
Normal rank

Revision as of 06:33, 27 February 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
III/49016 road: Zlin, bridge ev.No. 49016-2
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    70,941,124.95 Czech koruna
    0 references
    2,837,644.998 Euro
    10 January 2020
    0 references
    83,507,987.0 Czech koruna
    0 references
    3,340,319.48 Euro
    10 January 2020
    0 references
    84.9513052565858 percent
    0 references
    29 June 2016
    0 references
    13 April 2018
    0 references
    30 April 2018
    0 references
    Ředitelství silnic Zlínského kraje,příspěvková organizace
    0 references
    0 references
    76001
    0 references
    Předmětem projektu je rekonstrukce mostu ev. č. 49016-2 (nadjezdu u autobusového nádraží) včetně komunikace na něm a silnice III/49016 v uzlovém úseku č. 2 "Nadjezd", uzl. stan. km 0,205 - 0,659. Celková délka stavební úpravy silnice III/49016 včetně mostu je 454 m, z toho délka mostu je 196,6 m, vč. přechodových úseků 206 m. Rekonstrukce mostu ev. č. 49016-2 bude spočívat v celkové obnově mostního svršku vč. hydroizolace a odvodnění mostu, v sanaci nosné konstrukce a spodní stavby mostu. (Czech)
    0 references
    The purpose of the project is the reconstruction of the bridge between 49016 and 2 (in the case of the bus station), including the communication on it and the III/49016 road in the 2- hub, respectively km 0,205-0,659. The total length of the construction of the road III/49016, including the bridge, is 454 m, of which bridge length is 196.6 m, incl. transitional sections 206 m. (English)
    0 references

    Identifiers

    CZ.06.1.42/0.0/0.0/15_002/0001122
    0 references