Municipality of Transhipment of I/13 SO 102, SO 401, SO 801 (Q74548): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): The aim of the project is to improve the safety of traffic at the entrance to the municipality of Přerov, where communication I/13 (Děčín, connection to D8) and II/253 is crossed. The municipality ensures the implementation of the WM in the municipality’s assets (new communication for pedestrians with links to bus stops, VO and green). These buildings are part of the construction of a new ring road by the investor and the ŘSD is the ŘSD. The PD...) |
||
Property / summary | |||
The aim of the project is to improve the safety of traffic at the entrance to the municipality of Přerov, where communication I/13 (Děčín, connection to D8) and II/253 is crossed. The municipality ensures the implementation of the WM in the municipality’s assets (new communication for pedestrians with links to bus stops, VO and green). These buildings are part of the construction of a new ring road by the investor and the ŘSD is the ŘSD. The PD shall be drawn up at the stage of the PCA, the building permit shall be final. The Cíl.Group is the population, visitors, commuters and users. (English) | |||
Property / summary: The aim of the project is to improve the safety of traffic at the entrance to the municipality of Přerov, where communication I/13 (Děčín, connection to D8) and II/253 is crossed. The municipality ensures the implementation of the WM in the municipality’s assets (new communication for pedestrians with links to bus stops, VO and green). These buildings are part of the construction of a new ring road by the investor and the ŘSD is the ŘSD. The PD shall be drawn up at the stage of the PCA, the building permit shall be final. The Cíl.Group is the population, visitors, commuters and users. (English) / rank | |||
Normal rank |
Revision as of 06:17, 27 February 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Municipality of Transhipment of I/13 SO 102, SO 401, SO 801 |
Project in Czech Republic financed by DG Regio |
Statements
2,058,102.17 Czech koruna
0 references
2,421,296.68 Czech koruna
0 references
84.9999996695985 percent
0 references
20 January 2014
0 references
30 June 2018
0 references
30 June 2018
0 references
Obec Přestanov
0 references
40317
0 references
Cílem projektu je zvýšení bezpečnosti dopravy na vjezdu do obce Přestanov, kde se kříží komunikace I/13 (Děčín-Teplice, napojení na D8) a II/253. Obec zajišťuje realizaci SO v majetku obce (nová komunikace pro pěší s napojením na autobusové zastávky,VO a zeleň). Tyto stavební objekty jsou součástí výstavby nové okružní křižovatky-investorem je ŘSD ČR. Je zpracována PD ve stupni PDPS, stavební povolení jsou pravomocná. Cíl.skupinou jsou obyvatelé, návštěvníci, dojíždějící a uživatelé veř.dopravy. (Czech)
0 references
The aim of the project is to improve the safety of traffic at the entrance to the municipality of Přerov, where communication I/13 (Děčín, connection to D8) and II/253 is crossed. The municipality ensures the implementation of the WM in the municipality’s assets (new communication for pedestrians with links to bus stops, VO and green). These buildings are part of the construction of a new ring road by the investor and the ŘSD is the ŘSD. The PD shall be drawn up at the stage of the PCA, the building permit shall be final. The Cíl.Group is the population, visitors, commuters and users. (English)
0 references
Identifiers
CZ.06.1.37/0.0/0.0/15_016/0000983
0 references