Increase of grass speed in the Kumra — Tišnov_1 section (Q72171): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The aim of construction is to increase the line speed, to improve the comfort of driving times and reconstruction of the railway station for the current and prospective requirements of passenger transport operators, to improve the comfort of disabled passengers from the rehabilitation of access platforms, to develop the information system and to improve safety by means of new safety equipment., Adding English summary)
Property / summary
 
The aim of construction is to increase the line speed, to improve the comfort of driving times and reconstruction of the railway station for the current and prospective requirements of passenger transport operators, to improve the comfort of disabled passengers from the rehabilitation of access platforms, to develop the information system and to improve safety by means of new safety equipment. (English)
Property / summary: The aim of construction is to increase the line speed, to improve the comfort of driving times and reconstruction of the railway station for the current and prospective requirements of passenger transport operators, to improve the comfort of disabled passengers from the rehabilitation of access platforms, to develop the information system and to improve safety by means of new safety equipment. (English) / rank
 
Normal rank

Revision as of 19:59, 26 February 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Increase of grass speed in the Kumra — Tišnov_1 section
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    563,626,463.62 Czech koruna
    0 references
    22,545,058.544800002 Euro
    10 January 2020
    0 references
    680,441,208.0 Czech koruna
    0 references
    27,217,648.32 Euro
    10 January 2020
    0 references
    82.8325000004997 percent
    0 references
    9 January 2017
    0 references
    31 October 2018
    0 references
    31 October 2018
    0 references
    Správa železniční dopravní cesty, státní organizace
    0 references

    50°5'20.22"N, 14°25'13.04"E
    0 references

    50°5'7.01"N, 14°25'23.81"E
    0 references
    11000
    0 references
    Cílem stavby je zvýšení traťové rychlosti, zlepšení jízdního komfortu se zkrácením jízdních dob a rekonstrukce železniční stanice pro současné a výhledové požadavky objednavatelů osobní dopravy, zlepšení komfortu cestujících rekonstrukcí nástupišť pro bezbariérový přístup, vybudováním informačního systému a zvýšení bezpečnosti novým staničním zabezpečovacím zařízením. (Czech)
    0 references
    The aim of construction is to increase the line speed, to improve the comfort of driving times and reconstruction of the railway station for the current and prospective requirements of passenger transport operators, to improve the comfort of disabled passengers from the rehabilitation of access platforms, to develop the information system and to improve safety by means of new safety equipment. (English)
    0 references

    Identifiers

    CZ.04.1.41/0.0/0.0/15_001/0000085
    0 references