Reconstruction of pavements along the i/14 road in České Třeboč- Stage 2 (Q62695): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): The purpose of the project is the construction of a new section of the walkway along the short part of the busy road section of the I/14 road. The absence of a pedestrian at the site does not allow for safe and barrier-free movement in the case of permanent communication. The project will ensure the continuity of the new walkway on existing, barrier-free, walking line infrastructure. The intention is to eliminate the dangerous and potentially co...)
Property / summary
 
The purpose of the project is the construction of a new section of the walkway along the short part of the busy road section of the I/14 road. The absence of a pedestrian at the site does not allow for safe and barrier-free movement in the case of permanent communication. The project will ensure the continuity of the new walkway on existing, barrier-free, walking line infrastructure. The intention is to eliminate the dangerous and potentially conflict situations which arise from busy roads in everyday traffic. (English)
Property / summary: The purpose of the project is the construction of a new section of the walkway along the short part of the busy road section of the I/14 road. The absence of a pedestrian at the site does not allow for safe and barrier-free movement in the case of permanent communication. The project will ensure the continuity of the new walkway on existing, barrier-free, walking line infrastructure. The intention is to eliminate the dangerous and potentially conflict situations which arise from busy roads in everyday traffic. (English) / rank
 
Normal rank

Revision as of 11:33, 26 February 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of pavements along the i/14 road in České Třeboč- Stage 2
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    659,821.65 Czech koruna
    0 references
    26,392.866 Euro
    1 October 2020
    0 references
    694,549.11 Czech koruna
    0 references
    27,781.9644 Euro
    1 October 2020
    0 references
    94.9999993520976 percent
    0 references
    1 January 2018
    0 references
    23 October 2018
    0 references
    31 December 2019
    0 references
    Město Česká Třebová
    0 references
    0 references
    56002
    0 references
    Předmětem projektu je výstavba nového úseku chodníku podél krátké části úseku frekventované silnice I/14. Absence chodníku v lokalitě neumožňuje bezpečný a bezbariérový pohyb u frekventované komunikace. Projekt zajistí návaznost nového chodníku na stávající, bezbariérovou, pěší liniovou infrastrukturu. Záměrem je eliminovat nebezpečné a potenciálně kolizní situace, které u rušné silnice v každodenním provozu vznikají. (Czech)
    0 references
    The purpose of the project is the construction of a new section of the walkway along the short part of the busy road section of the I/14 road. The absence of a pedestrian at the site does not allow for safe and barrier-free movement in the case of permanent communication. The project will ensure the continuity of the new walkway on existing, barrier-free, walking line infrastructure. The intention is to eliminate the dangerous and potentially conflict situations which arise from busy roads in everyday traffic. (English)
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0007861
    0 references