Raising standards of paediatric care through the purchase of medical equipment and modernisation of branches located in the Children’s Pavilion at the M. Copernicus Voivodeship Hospital in Koszalin (Q139029): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Amélioration des normes en matière de soins pédiatriques grâce à l’achat de matériel médical et à la modernisation des succursales situées dans le Pavillon des enfants de l’hôpital de voïvodie de Kopernik à Koszalin | |||||||||||||||
Property / summary | |||||||||||||||
Ce projet constituera un projet d’infrastructure. Sa mise en œuvre peut être divisée en deux étapes principales: Étape I — Budowlane ROBOTS (exécuté en mode «design and build»). Cette tâche sera basée sur la réalisation de travaux de rénovation et de construction dans les domaines suivants: 1) Modernisation du Pavillon des enfants (bâtiment «C») — consistant en la reconstruction interne de: a) Admissions pour enfants, b) Département d’anaesthésiologie, de thérapie intensive pour enfants et de néonnatologie, c) Département de chirurgie des enfants avec bloc d’opération, d) Direction de l’enfance. La superficie totale de la modernisation prévue du bâtiment «C» (y compris l’ajout d’un puits d’ascenseur supplémentaire) sera env. 3 008,70 m². 2) Modernisation du département de nutrition hospitalière (la partie sous-sol du bâtiment «E») — consistant à améliorer l’état technique et l’infrastructure des locaux de ce département par sa reconstruction (au total env. 172 m² de surface totale). PHASE II — ACHAT DE MATÉRIEL MÉDICAL. Cette tâche consistera en l’achat de 54 équipements médicaux modernes et efficaces, qui seront modernisés plus tôt: 1) Département d’anaesthésiologie, d’enfance intensive et de thérapie néonatologique — où il est prévu d’acheter au total 26 équipements; 2) Chambre d’admission des enfants, où il est prévu d’acheter au total 26 articles d’équipement; 3) Département de chirurgie de l’enfance, où au total il est prévu d’acheter 2 pièces d’équipement. Dans le cadre de ce projet, il est également prévu d’exécuter un certain nombre de tâches d’accompagnement nécessaires à la mise en œuvre des tâches d’investissement susmentionnées et au règlement correct de l’investissement, y compris les activités liées à la préparation, à la gestion du projet et à la réalisation d’activités d’information et de promotion pour le projet. Le demandeur dispose du personnel médical et de l’infrastructure technique nécessaire à l’installation des équipements achetés. Une fois le projet achevé, il sera possible d’utiliser toute la fonctionnalité de l’infrastructure de l’hôpital. (French) | |||||||||||||||
Property / summary: Ce projet constituera un projet d’infrastructure. Sa mise en œuvre peut être divisée en deux étapes principales: Étape I — Budowlane ROBOTS (exécuté en mode «design and build»). Cette tâche sera basée sur la réalisation de travaux de rénovation et de construction dans les domaines suivants: 1) Modernisation du Pavillon des enfants (bâtiment «C») — consistant en la reconstruction interne de: a) Admissions pour enfants, b) Département d’anaesthésiologie, de thérapie intensive pour enfants et de néonnatologie, c) Département de chirurgie des enfants avec bloc d’opération, d) Direction de l’enfance. La superficie totale de la modernisation prévue du bâtiment «C» (y compris l’ajout d’un puits d’ascenseur supplémentaire) sera env. 3 008,70 m². 2) Modernisation du département de nutrition hospitalière (la partie sous-sol du bâtiment «E») — consistant à améliorer l’état technique et l’infrastructure des locaux de ce département par sa reconstruction (au total env. 172 m² de surface totale). PHASE II — ACHAT DE MATÉRIEL MÉDICAL. Cette tâche consistera en l’achat de 54 équipements médicaux modernes et efficaces, qui seront modernisés plus tôt: 1) Département d’anaesthésiologie, d’enfance intensive et de thérapie néonatologique — où il est prévu d’acheter au total 26 équipements; 2) Chambre d’admission des enfants, où il est prévu d’acheter au total 26 articles d’équipement; 3) Département de chirurgie de l’enfance, où au total il est prévu d’acheter 2 pièces d’équipement. Dans le cadre de ce projet, il est également prévu d’exécuter un certain nombre de tâches d’accompagnement nécessaires à la mise en œuvre des tâches d’investissement susmentionnées et au règlement correct de l’investissement, y compris les activités liées à la préparation, à la gestion du projet et à la réalisation d’activités d’information et de promotion pour le projet. Le demandeur dispose du personnel médical et de l’infrastructure technique nécessaire à l’installation des équipements achetés. Une fois le projet achevé, il sera possible d’utiliser toute la fonctionnalité de l’infrastructure de l’hôpital. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Ce projet constituera un projet d’infrastructure. Sa mise en œuvre peut être divisée en deux étapes principales: Étape I — Budowlane ROBOTS (exécuté en mode «design and build»). Cette tâche sera basée sur la réalisation de travaux de rénovation et de construction dans les domaines suivants: 1) Modernisation du Pavillon des enfants (bâtiment «C») — consistant en la reconstruction interne de: a) Admissions pour enfants, b) Département d’anaesthésiologie, de thérapie intensive pour enfants et de néonnatologie, c) Département de chirurgie des enfants avec bloc d’opération, d) Direction de l’enfance. La superficie totale de la modernisation prévue du bâtiment «C» (y compris l’ajout d’un puits d’ascenseur supplémentaire) sera env. 3 008,70 m². 2) Modernisation du département de nutrition hospitalière (la partie sous-sol du bâtiment «E») — consistant à améliorer l’état technique et l’infrastructure des locaux de ce département par sa reconstruction (au total env. 172 m² de surface totale). PHASE II — ACHAT DE MATÉRIEL MÉDICAL. Cette tâche consistera en l’achat de 54 équipements médicaux modernes et efficaces, qui seront modernisés plus tôt: 1) Département d’anaesthésiologie, d’enfance intensive et de thérapie néonatologique — où il est prévu d’acheter au total 26 équipements; 2) Chambre d’admission des enfants, où il est prévu d’acheter au total 26 articles d’équipement; 3) Département de chirurgie de l’enfance, où au total il est prévu d’acheter 2 pièces d’équipement. Dans le cadre de ce projet, il est également prévu d’exécuter un certain nombre de tâches d’accompagnement nécessaires à la mise en œuvre des tâches d’investissement susmentionnées et au règlement correct de l’investissement, y compris les activités liées à la préparation, à la gestion du projet et à la réalisation d’activités d’information et de promotion pour le projet. Le demandeur dispose du personnel médical et de l’infrastructure technique nécessaire à l’installation des équipements achetés. Une fois le projet achevé, il sera possible d’utiliser toute la fonctionnalité de l’infrastructure de l’hôpital. (French) / qualifier | |||||||||||||||
point in time: 3 December 2021
|
Revision as of 12:24, 3 December 2021
Project Q139029 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Raising standards of paediatric care through the purchase of medical equipment and modernisation of branches located in the Children’s Pavilion at the M. Copernicus Voivodeship Hospital in Koszalin |
Project Q139029 in Poland |
Statements
14,296,168.32 zloty
0 references
17,870,210.4 zloty
0 references
80.0 percent
0 references
21 September 2018
0 references
31 December 2020
0 references
SZPITAL WOJEWÓDZKI IM. MIKOŁAJA KOPERNIKA W KOSZALINIE
0 references
Przedmiotowy projekt będzie stanowił przedsięwzięcie o charakterze infrastrukturalny. Jego realizację można podzielić na dwa główne etapy: ETAP I - ROBOTY BUDOWLANE (prowadzone w trybie "zaprojektuj i wybuduj"). Zadanie to będzie opierało się na przeprowadzeniu prac remontowo-budowlanych w zakresie: 1) Modernizacji Pawilonu Dziecięcego (budynek "C") - polegającej na wewnętrznej przebudowie: a) Izby Przyjęć Dziecięcej, b) Oddziału Anestezjologii, Intensywnej Terapii Dziecięcej i Neonatologicznej, c) Oddziału Chirurgii Dziecięcej wraz z Blokiem Operacyjnym, d) Oddziału Dziecięcego. Łączna powierzchnia planowanej modernizacji budynku "C" (wraz z dobudową dodatkowego szybu windowego) wyniesie ok. 3 008,70 m2. 2) Modernizacji szpitalnego Działu Żywienia ( część piwniczna budynku „E”) – polegającej na poprawie stanu technicznego i infrastruktury pomieszczeń tego Działu poprzez jej przebudowę (łącznie ok. 172 m2 powierzchni całkowitej). ETAP II - ZAKUP APARATURY MEDYCZNEJ. Zadanie to będzie polegało na zakupie 54 szt. nowoczesnej i wydajnej aparatury medycznej, którymi doposażone zostaną zmodernizowane wcześniej: 1) Oddział Anestezjologii, Intensywnej Terapii Dziecięcej i Neonatologicznej - gdzie łącznie planuje się zakup 26 szt. sprzętu; 2) Izba Przyjęć Dziecięca, gdzie łącznie planuje się zakup 26 szt. sprzętu; 3) Oddział Chirurgii Dziecięcej, gdzie łącznie planuje się zakup 2 szt. sprzętu. W ramach niniejszego projektu zaplanowano także przeprowadzenie szeregu zadań towarzyszących jako elementów niezbędnych do zrealizowania wymienionych wcześniej zadań inwestycyjnych oraz prawidłowego rozliczenia inwestycji, w tym działań związanych z przygotowaniem projektu, zarządzaniem nim oraz prowadzeniem na jego rzecz działań informacyjno-promocyjnych. Wnioskodawca dysponuje kadrą medyczną i infrastrukturą techniczną niezbędną do instalacji zakupywanego sprzętu. Po zakończeniu projektu możliwe więc będzie wykorzystanie pełnej funkcjonalności infrastruktury Szpitala. (Polish)
0 references
This project will be an infrastructure project. Its implementation can be divided into two main stages: Stage I – BUDOWLANE ROBOTS (driven in “design and build” mode). This task will be based on the implementation of renovation and construction works in the area of: 1) Modernisation of the Children’s Pavilion (building “C”) – consisting of internal reconstruction: a) Children’s Reception Chamber, b) Department of Anaesthesiology, Intensive Child Care and Neonatological Care, (c) Children’s Surgery Division together with the Operational Block, (d) Children’s Department. The total area of the planned modernisation of building “C” (including the addition of an additional window shaft) will amount to approx. 3008,70 m². 2) Modernisation of the Hospital Nutrition Department (the cellar part of building “E”) – consisting of improving the technical condition and infrastructure of the premises of the Department through its reconstruction (total approx. 172 m² of total area). STAGE II – PURCHASE OF MEDICAL EQUIPMENT. This task will consist of purchasing 54 units of modern and efficient medical equipment, which will be retrofitted earlier: 1) Department of Anaesthesiology, Intensive Child Care and Neonatological Care – where a total of 26 pieces of equipment are planned to be purchased; 2) the Children’s Admissions Chamber, where a total of 26 pieces of equipment are planned to be purchased; 3) Department of Children’s Surgery, where a total of 2 pieces of equipment are planned to be purchased. This project also plans to carry out a number of accompanying tasks as elements necessary for the realisation of the aforementioned investment tasks and the proper settlement of investments, including activities related to the preparation, management and promotion of the project. The applicant shall have the medical staff and technical infrastructure necessary to install the purchased equipment. Once the project is completed, it will be possible to use the full functionality of the hospital infrastructure. (English)
21 October 2020
0 references
Ce projet constituera un projet d’infrastructure. Sa mise en œuvre peut être divisée en deux étapes principales: Étape I — Budowlane ROBOTS (exécuté en mode «design and build»). Cette tâche sera basée sur la réalisation de travaux de rénovation et de construction dans les domaines suivants: 1) Modernisation du Pavillon des enfants (bâtiment «C») — consistant en la reconstruction interne de: a) Admissions pour enfants, b) Département d’anaesthésiologie, de thérapie intensive pour enfants et de néonnatologie, c) Département de chirurgie des enfants avec bloc d’opération, d) Direction de l’enfance. La superficie totale de la modernisation prévue du bâtiment «C» (y compris l’ajout d’un puits d’ascenseur supplémentaire) sera env. 3 008,70 m². 2) Modernisation du département de nutrition hospitalière (la partie sous-sol du bâtiment «E») — consistant à améliorer l’état technique et l’infrastructure des locaux de ce département par sa reconstruction (au total env. 172 m² de surface totale). PHASE II — ACHAT DE MATÉRIEL MÉDICAL. Cette tâche consistera en l’achat de 54 équipements médicaux modernes et efficaces, qui seront modernisés plus tôt: 1) Département d’anaesthésiologie, d’enfance intensive et de thérapie néonatologique — où il est prévu d’acheter au total 26 équipements; 2) Chambre d’admission des enfants, où il est prévu d’acheter au total 26 articles d’équipement; 3) Département de chirurgie de l’enfance, où au total il est prévu d’acheter 2 pièces d’équipement. Dans le cadre de ce projet, il est également prévu d’exécuter un certain nombre de tâches d’accompagnement nécessaires à la mise en œuvre des tâches d’investissement susmentionnées et au règlement correct de l’investissement, y compris les activités liées à la préparation, à la gestion du projet et à la réalisation d’activités d’information et de promotion pour le projet. Le demandeur dispose du personnel médical et de l’infrastructure technique nécessaire à l’installation des équipements achetés. Une fois le projet achevé, il sera possible d’utiliser toute la fonctionnalité de l’infrastructure de l’hôpital. (French)
3 December 2021