Revision as of 19:36, 29 October 2020
Project Q137532 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Urban lighting exchange in Dziwnów |
Project Q137532 in Poland |
Statements
406,680.24 zloty
0 references
478,447.35 zloty
0 references
85.0 percent
0 references
20 September 2018
0 references
31 December 2018
0 references
GMINA DZIWNÓW
0 references
Zakresem rzeczowym przedmiotowej inwestycji będzie wymiana opraw oświetlenia miejskiego na terenie miasta Dziwnów z sodowego na LEDowe. Pozwoli to na zredukowanie kosztów eksploatacyjnych, będąc rozwiązaniem zarówno ekonomicznym, jak i ekologicznym oraz zminimalizowanie ryzyka niekorzystnego wpływu instalacji na środowisko naturalne. Niskie koszty utrzymania LED-owego oświetlenia drogowego wynikają nie tylko z ich energooszczędności, ale także z trwałości, czyli braku konieczności częstego serwisowania czy konserwacji. Inwestycja ma charakter stacjonarny oraz dotyczy modernizacji istniejącego na danym terenie oświetlenia. W wyniku realizacji przedmiotowego przedsięwzięcia nastąpi: -wymiana oświetlenia miejskiego na oświetlenie energooszczędne zmniejszające uciążliwość infrastruktury dla środowiska oraz minimalizujące koszty utrzymania infrastruktury miejskiej, -racjonalizacja kosztów w wyniku zastosowania rozwiązań energooszczędnych, - zapobieganie degradacji środowiska naturalnego oraz zmniejszenia emisji dwutlenku węgla, kształtowanie świadomości ekologicznej mieszkańców gminy oraz postaw i zachowań proekologicznych. Najważniejszymi etapami projektu są: 1. przygotowanie oraz przeprowadzenie postępowania na wykonawcę modernizacji oświetlenia, 2. Podpisanie umowy z wyłonionym wykonawcą, 3. Realizacja projektu, 4. Odbiór instalacji. Wybrane rozwiązane technologiczne jest innowacyjne oraz proekologiczne, zmniejszające uciążliwość infrastruktury dla środowiska. Szczegółowy opis wybranych rozwiązań znajduję się w punkcie 4.1.3.2 Studium wykonalności. Procentowy udział ilości punktów świetlnych podlegających modernizacji wynosi 70%. Założenia projektu są zgodnie z wymogami określonymi w pkt 1.2 „Typy projektów, zasady przyznawania dofinansowania i wyłączenia z możliwości dofinansowania” Regulaminu konkursu. Projekt jest zgodny z utworzonym dla gminy Planem GospodarkiNiskoemisyjnej. Liczba lamp do wymiany: 42W- 1 szt. 70W- 391 szt. 100W- 63 szt. 150- 8 szt. (Polish)
0 references
The material scope of the investment will be the exchange of luminaires of urban lighting in the city of Dziwnów from sodium to LED. This will reduce operating costs by providing both an economic and environmental solution and minimise the risk of unfavourable environmental impacts of the installation. Low maintenance costs of LED road lighting are due not only to their energy efficiency, but also to their durability, i.e. the lack of frequent maintenance or maintenance. The investment is of a fixed nature and concerns the modernisation of existing lighting in a given area. As a result of the implementation of the project, the following will be: —exchange of urban lighting into energy-efficient lighting reducing the burden of infrastructure for the environment and minimising the costs of maintaining urban infrastructure, -rationalisation of costs as a result of the use of energy-efficient solutions, – prevention of environmental degradation and reduction of carbon dioxide emissions, formation of environmental awareness of local residents and environmental attitudes and behaviours. The most important stages of the project are: 1. preparation and conduct of proceedings on the contractor of lighting modernisation, 2. Signing of the contract with the selected contractor, 3. Implementation of the project, 4. Receiving the installation. Selected technological solutions are innovative and environmentally friendly, reducing the burden of infrastructure to the environment. Detailed description of selected solutions can be found in section 4.1.3.2 Feasibility study. The percentage of light points to be upgraded shall be 70 %. The project’s assumptions are in accordance with the requirements set out in point 1.2. “Types of projects, rules for granting funding and exclusion from funding” of the Rules of Procedure. The project is in line with the Low-Emission Economy Plan created for the municipality. Number of replacement lamps: 42 W- 1 pcs 70 W- 391 pcs 100 W- 63 pcs 150-8 pcs (English)
21 October 2020
0 references
Identifiers
RPZP.02.01.00-32-0005/17
0 references