Investments in RES in COWIK in Bartoszyce (Q132014): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 19:02, 29 October 2020

Project Q132014 in Poland
Language Label Description Also known as
English
Investments in RES in COWIK in Bartoszyce
Project Q132014 in Poland

    Statements

    0 references
    516,910.57 zloty
    0 references
    124,058.54 Euro
    13 January 2020
    0 references
    608,130.08 zloty
    0 references
    145,951.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 October 2016
    0 references
    31 March 2019
    0 references
    WODOCIAGOWO-CIEPŁOWNICZA SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOSCIA "COWIK" W BARTOSZYCACH
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Przedmiotem projektu jest budowa instalacji fotowoltaicznych zlokalizowanej Gminie Miasto Bartoszyce (działa 12/3 w obrębie ewidencyjnym Bartoszyce). Instalacja gruntowe wybudowane w oparciu o panele polimorficzne, fotowoltaiczne Projektowana instalacja fotowoltaiczna o łącznej mocy zainstalowanej 99,90kWp w panelach fotowoltaicznych, posadowiona na gruncie. W skład danej instalacji będzie wchodzić 333 szt. paneli fotowoltaicznych 300W oraz 4 szt. Inwertera 25 kW. Sposób wdrażania: projekt wdrażany będzie samodzielnie przez Wnioskodawcę. Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z zasadą pzp. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harm. -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie projektu Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność firmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    The subject of the project is the construction of photovoltaic installations located in the Municipality of Bartoszyce (action 12/3 within the Bartoszyce registration area). Ground installation built on polymorphic, photovoltaic panels Designed photovoltaic installation with total installed capacity of 99.90kWp in photovoltaic panels, positioned on the ground. The installation will consist of 333 pieces of photovoltaic panels 300 W and 4 pcs. 25 kW inverter. Method of implementation: the project will be implemented independently by the Applicant. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor in accordance with the pp. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the assumed harm. —completing the project and signing the final protocol -final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the company’s competitiveness. The cost of energy consumption will fall as a result of the investment. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0425/16
    0 references