Construction of PZOK in the Jaraczewo commune. (Q134995): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 18:54, 29 October 2020
Project Q134995 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of PZOK in the Jaraczewo commune. |
Project Q134995 in Poland |
Statements
597,823.76 zloty
0 references
703,322.08 zloty
0 references
85.0 percent
0 references
1 July 2019
0 references
31 August 2020
0 references
GMINA JARACZEWO
0 references
Przedmiotem projektu jest budowa Punktu Selektywnej Zbiórki Odpadów Komunalnych (PSZOK) zlokalizowanego na gruncie działki o nr ewid.425/2.Projekt został podzielony na cztery zadania:Zad 1 Budowa punktu selektywnej zbiórki odpadów komunalnych, w tym:-kontenerowego budynku socjalno-biurowego o stalowej konstrukcji nośnej obiektu, zgodnie z wytycznymi producenta prefabrykowanego kontenera wraz z mediami: wodociąg, kanalizacja deszczowa, instalacja elektryczna-murów oporowych do rampy załadowczej o wysokości: 205 cm oraz szerokości: 99 cm-zbiornika bezodpływowego na ścieki sanitarne,-utwardzenie terenu w postaci betonowej kostki brukowej o wytrzymałości na ściskanie nie mniejszej niż 50 MPa z uwzględnieniem warstw przekrojowych:-Kostka brukowa gr.8cm, Podsypka piaskowo cementowa 2,5-5MPa gr. 4cm, Beton C12/15 gr. 30cm, podsypka piaskowa Is=0,99 gr.40cm-postawienie bramy samonośnej wysięgnikowo zawieszonej nad wjazdem. Brama składająca się z szyny jezdnej, zespołu jezdnego, konstrukcji zamkniętejskrzydła bramy, ramy prowadzącej,słupa zamykającego wyposażonego w chwytak oraz podpory tylnej stabilizującej skrzydło-ogrodzenie za pomocą panela kratowego zgrzewanego z prętów stalowych (poziomych podwójnych i pionowych pojedynczych.Wyposażenie PSZOK w kontenery: 5 sztuk o poj. 18 m3 (4500x2300x1750 mm)oraz 5 sztuk o poj, 7m3 (4500x1700x1000 mm), 1 szt o poj. 30m3(6500*2300*2000) oraz 1 szt o poj. 15 m3 (3700*2200*1900)Liczba kampanii informacyjno-edukacyjnych związanych z gospodarką odpadami wynosi 1. Liczba wspartych Punktów Selektywnego Zbierania Odpadów Komunalnych wynosi 1. Zad 2 Promocja projektu polegająca na przygotowaniu i umieszczeniu na stałe tablicy pamiątkowej po zakończeniu projektu, a w czasie realizacji projektu tablicy informacyjnej.Zad 3 Edukacja ekologiczna- projekt ulotek i plakatu, druk ulotek i plakatu oraz konkurs wiedzy ekologicznej z nagrodami.Zad 4 Inspektor nadzoru.Łączny koszt inwestycji to 871 236,16 zł. w tym koszty kwalifikowane to: 708 322,08 zł (Polish)
0 references
The object of the project is the construction of the Municipal Waste Collection Point (PSZOK) located on the ground of the plot no.425/2.The project was divided into four tasks:Zad 1 Construction of a separate collection point for municipal waste, including:-container of a social office building with a steel supporting structure, according to the guidelines of the manufacturer of prefabricated container and media: water supply, rainwater drainage system, electrical dams for loading ramp with height: 205 cm and width: 99 cm-water-free tank for sanitary sewage,-heavy ground in the form of concrete paving cube with compressive strength of not less than 50 MPa including cross-sectional layers:-Cobbler gr.8cm, sandbag cement 2.5-5MPa gr. 4 cm, Concrete C12/15 gr. 30 cm, sand-sprinkled Is=0,99 gr.40cm-position of the self-contained gate. Gate consisting of a road rail, a mobile unit, a closed door wing structure, a guide frame, a clamping post equipped with a gripper and a rear support stabilising the wing-garden by means of a welded grid panel made of steel rods (horizontal double and vertical singles.PPSOK equipment with containers: 5 pieces in a room. 18 m³ (4500x2300x1750 mm) and 5 pieces with a poj, 7 m³ (4500x1700x1000 mm), 1 pcs with capacity. 30 m³(6500*2300*2000) and 1 pcs. 15 m³ (3700*2200*1900)The number of information and education campaigns related to waste management is 1. The number of supported Municipal Waste Collection Points is 1. Zad 2 Project promotion consisting of preparing and permanently placing a commemorative plaque after the completion of the project, and during the implementation of the information board project.Zad 3 Environmental education – flyer and poster project, printing of leaflets and posters and a competition of ecological knowledge with prizes.Zad 4 Supervisory Inspector.The total cost of the investment is PLN 871,236.16. 708 322,08 PLN (English)
21 October 2020
0 references
Identifiers
RPWP.04.02.01-30-0013/18
0 references