Thermal modernisation of the buildings of the Volunteer Fire Service in Świerklaniec and in Orzech (Q123888): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Thermomodernisation des bâtiments du Service volontaire d’incendie à Świerklanie et à Orzech |
Revision as of 08:04, 2 December 2021
Project Q123888 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the buildings of the Volunteer Fire Service in Świerklaniec and in Orzech |
Project Q123888 in Poland |
Statements
435,004.79 zloty
0 references
511,770.33 zloty
0 references
85.0 percent
0 references
12 December 2018
0 references
30 September 2019
0 references
GMINA ŚWIERKLANIEC
0 references
Przedmiotem projektu jest termomodernizacja dwóch budynków będących własnością Gminy Świerklaniec, w których siedziby mają dwie Ochotnicze Straże Pożarne: OSP Świerklaniec i OSP Orzech. W ramach projektu zostaną wykonane: - zmniejszenie strat przez przenikanie przez ściany zewnętrzne i strop: ocieplenie ścian - metoda bezspoinowa oparta na styropianie jako materiale izolacyjnym, - zmniejszenie strat przez przenikanie przez okna, drzwi i bramy oraz zmniejszenie strat na podgrzanie powietrza wentylacyjnego: wymiana ślusarki i stolarki okiennej i drzwiowej, bramy wjazdowej. - modernizacja c.o. - wymiana kotłów węglowych na kotły gazowe wraz z inst.co i c.w.u. Całość zadania zostanie wykonana w 2018r. i 2019r. Celem projektu jest zwiększenie efektywności energetycznej budynków użyt. publicznej w Gminie Świerklaniec poprzez wykon. kompleksowej termomodernizacji. Po realizacji nastąpi zmn. emisji CO2 o 66,32 t/rok (76,45%) oraz obniżenie zapotrzebowania na ciepło o 551,75 GJ/rok (60,24%). (Polish)
0 references
The subject of the project is the thermal modernisation of two buildings owned by Świerklaniec Municipality, in which two Volunteer Fire Departments are based: OSP Świerklaniec and OSP Nutcrackers. As part of the project, the following will be carried out: — reduction of losses by penetrating the outer walls and ceiling: wall warming – a sideless method based on styrofoam as insulation material, – reduction of losses by penetrating windows, doors and gates and reducing losses on heating of ventilation air: replacement of the locksmith and window and door carpentry, entrance gate. — modernisation of central heating – replacement of coal boilers for gas boilers together with inst.co and hot water. The whole task will be carried out in 2018 and 2019. The aim of the project is to increase the energy efficiency of public buildings in Świerklaniec Municipality through comprehensive thermomodernisation. After implementation, CO2 emissions will be increased by 66.32 t/year (76.45 %) and a reduction in the demand for heat by 551.75 GJ/year (60.24 %). (English)
21 October 2020
0 references
Identifiers
RPSL.04.03.01-24-04DC/17
0 references