Construction of the N-S Route in Ruda Śląskie connecting the Road Medium Route with the A4 motorway – stage II (Q124482): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Construction de la route N-S à Ruda Śląskie reliant la route moyenne à l’autoroute A4 — étape II |
Revision as of 08:38, 2 December 2021
Project Q124482 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the N-S Route in Ruda Śląskie connecting the Road Medium Route with the A4 motorway – stage II |
Project Q124482 in Poland |
Statements
110,483,864.63 zloty
0 references
165,395,006.93 zloty
0 references
66.8 percent
0 references
7 October 2014
0 references
23 December 2020
0 references
MIASTO RUDA ŚLĄSKA
0 references
Przedmiotem projektu jest budowa ostatniego odcinka trasy N-S, która ma na celu utworzenie bezkolizyjnego połączenia Drogowej Trasy Średnicowej z autostradą A4. Odcinek ten obejmuje budowę trasy N-S o długości 1670 m od ul. Kokota do połączenia z autostradą A4 w węźle „Wirek”. W ramach projektu przewidziano budowę m.in.: - obiektów inżynierskich - elementów systemu odwodnienia - chodników i ścieżek rowerowych - elementów bezpieczeństwa ruchu drogowego takich jak: bariery ochronne, oznakowanie poziome i pionowe - oświetlenia wzdłuż całej trasy - przepustów zintegrowanych z przejściem dla małych zwierząt. Celem projektu jest: - zwiększenie dostępności DTŚ i autostrady A4 - bezkolizyjne połączenie DTŚ z autostradą A4 - zwiększenie przepustowości DW 925 w kierunku pn.– pd. - zwiększenie bezpieczeństwa ruchu na ul. 1 Maja - skrócenie czasu przejazdu pomiędzy pn. i pd. dzielnicami miasta oraz ul. 1 Maja - podniesienie atrakcyjności inwestycyjnej terenów położonych w ciągu ul. 1 Maja i N-S (Polish)
0 references
The object of the project is the construction of the last section of the N-S route, which aims to establish an uncollid connection of the Road Medium Route with the A4 motorway. This section includes the construction of the N-S route 1670 m from the street. Kokota to connect to the A4 motorway in the “Wirek” junction. The project included the construction of: — engineering facilities – elements of the drainage system – pavements and cycle paths – road safety elements such as: protective barriers, horizontal and vertical markings – illumination along the whole route – culverts integrated into the transition for small animals. The aim of the project is to: — increasing the availability of DTŚ and the A4 motorway – a collision-free connection between the DTŚ and the A4 motorway – increasing the capacity of DW 925 in the direction BC – pd. — increasing traffic safety on ul. 1 May – shortening the journey time between BC and south of the city districts and street. 1 May – increase the investment attractiveness of areas located in the street. 1 May and N-S (English)
21 October 2020
0 references
Identifiers
RPSL.06.01.00-24-09EE/16