Seven for all – dissemination of pre-school education in Kościerzyn (Q121116): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Sept pour tous — promouvoir l’éducation préscolaire à Kościerzyna |
Revision as of 07:43, 2 December 2021
Project Q121116 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Seven for all – dissemination of pre-school education in Kościerzyn |
Project Q121116 in Poland |
Statements
653,745.01 zloty
0 references
769,111.78 zloty
0 references
85.0 percent
0 references
3 December 2018
0 references
31 August 2020
0 references
GMINA MIEJSKA KOŚCIERZYNA
0 references
Diagnoza potrzeb w zakresie upowszechnienia ed.przedszkolnej Gm.M.K-na(Zarządzenie 0050.52.2016 z12.04.2016,aktual-Zarz.0050.37.2018z 8.03.2018), w perspektywie 3letniej, wykazała konieczność zwiększenia dostępności do ed. przedszkolnej dla dzieci zamieszkałych na ter. miasta Kościerzyna. W br. na 1140 miejsc chodzi do przedszkola 1205 dzieci. Realizacja projektu w Przedszkolu Nr 7(P7)przy Szkolnej 2 w K-nie(P7S). Powstanie 50 nowych miejsc wsparcia przedszk.(NMWP), na które przyjęte zostaną dzieci nie objęte edukacją przedszkolną. Modernizacji i rozbudowie poddany zostanie plac zabaw P7S. Infrastruktura jest własnością Wnioskodawcy. Zostaną poniesione koszty na wyposażenie dodatkowych pomieszczeń w meble i niezbędny sprzęt, również ICT oraz pomoce dydaktyczne, a także doposażenie kuchni przedszkola. Finansowanie bieżącej działalności NMWP będzie prowadzone od 09.2019 do 08.2020 wyłącznie ze środków EFS. Zostanie zapewniona trwałość efektów przez min. 3-letnie utrzymanie NMWP w P7, a cross-u 5-letnią. Diagnoza wykazała też konieczność podniesienia jakości edukacji przedszkolnej w P7S. Projekt zakłada zajęcia dodatkowe dla 100 dzieci P7S oraz podniesienie kompetencji co najmniej 9 nauczycieli. Zajęciami wyrównującymi szanse ed. zostanie objętych 45 dzieci, a zaj.w ramach kompetencji klucz.70 dzieci. Uczestnicy skorzystają z kilku form wsparcia. Dodatkowe zajęcia prowadzone będą ponad te realizowane przez OWP w ciągu ost. 12m-cy. Limit 30% kosztów bezpośr. na zajęcia dodatkowe nie zostanie przekroczony. Partner 1-przeprowadzi badania rozwojowe i przesiewowe dzieci w P7S, które pozwolą w optymalny sposób wyłonić dzieci z deficytami. W razie potrzeby zastosowany zostanie mechanizm racjonalnych usprawnień dla dzieci niepełnospr. Partner 2 służył wsparciem w zakresie wyposażenia NMWP i placu zabaw, poprowadzi zaj. logopedyczne i robotykę dla dzieci z P7S. W ramach całego procesu kształcenia kompetencji dzieci i doskonalenia nauczycieli wykorzystywane będą narzędzia TIK. (Polish)
0 references
Diagnosis of needs in the area of pre-school distribution of Gm.M.K-na (Order 0050.52.2016 z12.04.2016,aktual-Zarz.0050.37.2018z 8.03.2018), in the perspective of 3 years, showed the need to increase the availability of preschool ed. for children residing in the terrestrial town of Kościerzyna. In this year, 1205 children go to kindergarten for 1140 places. Implementation of the project in Kindergarten No 7(P7) at School 2 in K-no(P7S). There will be 50 new pre-school support sites (NMWP) for which children not covered by preschool education will be accepted. The P7S playground will be modernised and expanded. The infrastructure is owned by the Applicant. Costs will be incurred to equip additional rooms with furniture and necessary equipment, including ICT and teaching aids, as well as retrofitting the kindergarten kitchen. The financing of NMWP’s ongoing activities will be carried out from 09.2019 to 08.2020 exclusively from the ESF. The longevity of the effects will be ensured by minimum 3-year maintenance of NMWP in P7, and cross 5-years. The diagnosis also demonstrated the need to improve the quality of preschool education in P7S. The project includes additional classes for 100 P7S children and an improvement of the competences of at least 9 teachers. 45 children will be included in equalising ed. classes, and within the framework of the competence key 70 children. Participants will benefit from several forms of support. Additional activities will be conducted above those carried out by the PLO during the last period. It’s 12 months. The limit of 30 % of the direct costs for additional classes will not be exceeded. Partner 1 will carry out development and screening of children in P7S, which will optimally identify children with deficits. If necessary, a mechanism of rational improvement will be applied for children under-supply. Partner 2 provided support in the area of NMWP equipment and playground, will lead speech therapy and robotics for children with P7S. ICT tools will be used throughout the learning process of children’s competence and teacher training. (English)
21 October 2020
0 references
Identifiers
RPPM.03.01.00-22-0021/18
0 references