THERMAL MODERNISATION OF THE NZOZ BUILDING MEDICAL ANALYSIS LABORATORY IN PRZEMYŚL (Q118642): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 15:43, 29 October 2020
Project Q118642 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | THERMAL MODERNISATION OF THE NZOZ BUILDING MEDICAL ANALYSIS LABORATORY IN PRZEMYŚL |
Project Q118642 in Poland |
Statements
811,801.59 zloty
0 references
1,036,783.67 zloty
0 references
78.3 percent
0 references
13 April 2018
0 references
31 December 2019
0 references
NIEPUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ LABORATORIUM ANALIZ MEDYCZNYCH EWA SZWAJKOWSKA-CHWALISZ
0 references
Przedmiotowy projekt inwestycyjny polega na przeprowadzeniu termomodernizacji obiektu Niepublicznego Zakładu Opieki Zdrowotnej Laboratorium Analiz Medycznych (skrót: NZOZ LAM) w Przemyślu, będącego budynkiem ochrony zdrowia.W ramach realizacji przedmiotowego projektu termomodernizacji poddane zostanie 1122,6 m2 powierzchni użytkowej. Zamontowany zostanie 1 zestaw paneli fotowoltaicznych o mocy 8 kW. Realizacja projektu jest odpowiedzią na zdefiniowane problemy wykazane w przeprowadzonym audycie energetycznym. Głównym celem projektu jest poprawa efektywności energetycznej ww. budynku.Cel główny realizowany będzie poprzez następujący cele szczegółowe: •Poprawa stanu technicznego obiektu; •Zwiększenie efektywności zarządzania energią; •Ograniczenie zapotrzebowania na energię w budynku; •Ograniczenie niskiej emisji gazów cieplarnianych; •Ochrona środowiska; •Obniżenie kosztów operacyjnych. Przeprowadzona termomodernizacja obiektu przełoży się bezpośrednio na zmniejszenie zapotrzebowania na energię, a więc na zwiększenie efektywności energetycznej budynku.Realizacja celu głównego jak również celu szczegółowego nierozerwalnie związana jest z długoterminowymi korzyściami, jakie zostaną osiągnięte poprzez realizacje projektu, tj.: 1.Oszczędność energii w budynku (Ilość zaoszczędzonej energii elektrycznej-55,53MWh/rok, Ilość zaoszczędzonej energii cieplnej -882,68GJ/rok); 2.Wytwarzanie energii z OZE (Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE-6,74MWhe/rok); 3.Osiągniecie jak największej efektywności energetycznej (Zmniejszenie zużycia energii końcowej -1082,60 GJ/rok, Zmniejszenie rocznego zużycia energii pierwotnej-455470,82kWh/rok); 4.Zmniejszenie emisji CO2 i pyłów (Szacowany roczny spadek emisji gazów cieplarnianych-237,91 Tony równoważnika CO2, Zmniejszenie emisji pyłów PM-10-606,01kg/rok); 5.Promowanie postaw związanych z oszczędzaniem energii; 6.Zwiększenie odpowiedzialności za stan środowiska i zanieczyszczenie powie (Polish)
0 references
This investment project consists of thermal modernisation of the facility of the Non-public Health Care Laboratory Laboratory of Medical Analysis (abbreviation: NZOZ LAM) in Przemyśl, which is a health care building.As part of the implementation of this project, 1122.6 m² of usable space will be subjected to thermal modernisation. 1 set of 8 kW photovoltaic panels will be installed. The implementation of the project is a response to defined problems demonstrated in the conducted energy audit. The main objective of the project is to improve the energy efficiency of the building.The main objective will be implemented through the following specific objectives: •Improving the technical condition of the facility; • Increasing energy management efficiency; •Reducing energy demand in the building; • Reducing low greenhouse gas emissions; •Environmental protection; •Reducing operating costs. The thermal modernisation of the facility will translate directly into a reduction in energy demand, i.e. to increase the energy efficiency of the building.The achievement of the main target and the specific objective is inextricably linked to the long-term benefits that will be achieved through the realisation of the project, i.e.: 1.Energy savings in the building (The amount of electricity saved – 55,53 MWh/year, The amount of thermal energy saved -882.68GJ/year); 2.Producing energy from RES (Manufacture of electricity from newly built RES installations-6,74MWhe/year); 3.To achieve as much energy efficiency as possible (Decrease final energy consumption -1082.60 GJ/year, Reduction of annual primary energy consumption – 455470.82 kWh/year); 4.Reduction of CO2 and dust emissions (Assessed annual decrease in greenhouse gas emissions-237.91 tonnes of CO2 equivalent, Reduction of PM-10-606.01 kg/year dust emissions); 5.Promoting energy-saving attitudes; 6. Increasing environmental responsibility and pollution (English)
20 October 2020