Construction of Local Government Preschool in Kamień – stage II (Q119233): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 15:29, 29 October 2020

Project Q119233 in Poland
Language Label Description Also known as
English
Construction of Local Government Preschool in Kamień – stage II
Project Q119233 in Poland

    Statements

    0 references
    330,396.05 zloty
    0 references
    79,295.05 Euro
    13 January 2020
    0 references
    388,701.28 zloty
    0 references
    93,288.31 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 July 2016
    0 references
    31 August 2017
    0 references
    GMINA KAMIEŃ
    0 references
    0 references
    Projekt ma na celu zwiększenie dostępności edukacji przedszkolnej na terenie gm. Kamień poprzez budowę Przedszkola Samorządowego dla 60 dzieci w wieku od 3 do 5 lat, podzielonych na 3 grupy. Obiekt usytuowany jest na dz. ewid. nr 3772/2 w m. Kamień. Obecnie obiekt znajduje się w stanie surowym częściowo zamkniętym. Jest to budynek 2-kondygnacyjny niepodpiwniczony, z poddaszem mieszkalnym. Zakres rzeczowy dotyczący pomieszczeń mieszkalnych na poddaszu, został wyłączony z niniejszego projektu. Wykaz pomieszczeń wchodzących w skład przedszkola: 2 sale zabaw, świetlica spełniająca funkcję związaną z edukacją przedszkolną, kuchnia z zapleczem, hall z szatnią, pokój socjalny, sanitariaty oraz komunikacja. Ponadto na parterze obiektu znajduje się pom. kotłowni, które będzie wspólne dla przedszkola i części mieszkalnej. Podstawowe parametry techniczne obiektu: 1) pow. zabudowy 361,77 m2; 2) pow. użytkowa przedszkola 279,18 m2; 3) pow. użytkowa kotłowni 4,92 m2; 3) kubatura 2135,65 m3; 4) wys. pom. 3,05 m; 5) wys. budynku 8,72 m. Planowany zakres rzeczowy: 1. Roboty budowlane (podłoża i posadzki, tynki, malowania i oblicowania, stolarka, elewacja, schody zewnętrzne i podjazd dla niepełnosprawnych); 2. Instalacje sanitarne (instalacje wodno-kanalizacyjne, c.o., kotłownia i gazowe); 3. Instalacja solarna c.w.u.; 4. Instalacje elektryczne i odgromowe; 5. Zakup sprzętu ICT (3 szt.); 6. Zakup wyposażania sal zabaw (88 szt.); 7. Zakup sprzętu kuchennego (8 szt.). Projekt w swoim założeniu przystosowany jest do potrzeb osób niepełnosprawnych, przewidziano w nim realizację racjonalnych usprawnień dla osób z niepełnosprawnościami. Obiekt będzie spełniał aktualne wymogi związane z oszczędnością energii. W ramach projektu nastąpi wzrost zatrudnienia, przewiduje się zatrudnić 5 osób: 3 wychowawców i 2 osoby personelu kuchennego. (Polish)
    0 references
    The project aims to increase the availability of preschool education in the building. Stone through the construction of a Local Government Kindergarten for 60 children aged 3 to 5, divided into 3 groups. The building is located on Dz. Evid. No. 3772/2 in m. Stone. It is currently in a semi-closed state. It is a 2-storey building with no cellar, with an attic. The material scope for living spaces in the attic has been excluded from this project. List of premises of kindergarten: 2 playrooms, common room fulfilling the function of preschool education, kitchen with facilities, hall with locker room, social room, sanitary facilities and communication. In addition, on the ground floor of the building there is a boiler room which will be common to the kindergarten and residential area. Basic technical parameters of the facility: 1. the area of construction 361,77 m²; 2) usable area of kindergarten 279,18 m²; 3) usable area of boiler room 4,92 m²; 3) volume of 2135,65 m³; 4) W. pom. 3,05 m; 5) Building height 8.72 m. Planned material range: 1. Construction work (grounds and floors, plaster, painting and walling, carpentry, facade, exterior staircase and driveway for the disabled); 2. Sanitary installations (water and sewage installations, central heating, boiler and gas plants); 3. Solar heating installation; 4. Electrical and lightning protection systems; 5. Purchase of ICT equipment (3 pieces); 6. Purchase of playground equipment (88 pieces); 7. Purchase of kitchen equipment (8 pieces). The project is adapted to the needs of people with disabilities and provides for rational improvements for people with disabilities. The facility will meet current energy saving requirements. As part of the project there will be an increase in employment, 5 people are expected to employ: 3 educators and 2 kitchen staff. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.06.04.01-18-0033/16
    0 references