Construction of implementation and office facilities for small and medium-sized enterprises (Q114747): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Construction d’installations de mise en œuvre et de bureaux pour les petites et moyennes entreprises |
Revision as of 20:08, 1 December 2021
Project Q114747 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of implementation and office facilities for small and medium-sized enterprises |
Project Q114747 in Poland |
Statements
19,997,810.04 zloty
0 references
32,161,161.22 zloty
0 references
62.18 percent
0 references
1 February 2018
0 references
31 October 2019
0 references
PARK NAUKOWO -TECHNOLOGICZNY W OPOLU SP. Z O.O.
0 references
Przedmiotem projektu jest budowa przez Park Naukowo-Technologiczny sp. z o.o. zaplecza wdrożeniowego i biurowego z przeznaczeniem na potrzeby przedsiębiorstw w tym szczególności z sektora MŚP. Obiekt objęty zakresem projektu zlokalizowany zostanie w powiecie opolskim, gm. Opole, m. Opole, na działkach ew. 112; 113; 114/1; 116; 117; 118/1; 13/8; 13/12. Teren na którym zlokalizowana zostanie inwestycja w MPZP oznaczony został symbolem "4U" tereny usług. Powstały w wyniku realizacji projektu obiekt będzie miał charakter usługowy o zróżnicowanym programie użytkowym. Całość budynku obejmować będzie 6 modułów hal wraz z zapleczem administracyjnym, sanitarnym i socjalnym oraz pow. biurowe o zróżnicowanej powierzchni. Wszystkie powierzchnie są przeznaczone pod wynajem do prowadzenia różnicowanej działalności usługowej zgodnej z MPZP przez przedsiębiorstwa w tym szczególności z sektora MŚP a funkcjonujących w ramach PNT w Opolu sp. z o.o.. Zakres i rodzaj robót budowlano-montażowych przewidziany do realizacji określony został w dokumentacji budowlanej i obejmuje: 1) Roboty ogólnobudowlane w zakresie stanu zero, konstrukcji żelbetowej i murowej, studni wodomierzowej, dachu, elewacji, podłoży i posadzek, ścianek działowych, stolarki otworowej, okładzin ścian i stropów, osłony śmietnika; 2) Instalacje sanitarne w zakresie przyłącza i instalacji wodno-kanalizacyjnego, gazowej i centralnego ogrzewania, instalacji wentylacji i klimatyzacji; 3) Instalacje elektryczne w zakresie wewnętrznej instalacji elektrycznej i zewnętrznej instalacji elektrycznej; 4) Wewn. infrastrukturę komunikacyjną w zakresie dróg podrzędnych obejmujące drogę i plac dostawczy, drogę dojazdową, zatoki postojowe, chodniki, drogę pożarową. Materialnymi efektami projektu czyli produktami, które powstaną w wyniku jego realizacji będą: przygotowanie terenów inwestycyjnych o pow. 3,00 ha , dostosowanie obiektu (1 szt.) do potrzeb osób z niepełnosprawnościami oraz wzrost zatrudnienia -10 osób (Polish)
0 references
The subject of the project is the construction of implementation and office facilities by the Science and Technology Park sp. z o.o. for the needs of enterprises in particular from the SME sector. The object falling within the scope of the project will be located in the district of Opolskie, Gm. Opole, m. Opole, on plots of approx. 112; 113. 114/1; 116. 117. 118/1; 13/8; IT’S 13/12. The area on which the investment in the MPZP will be located is marked with the symbol “4U” of service areas. The object created as a result of the implementation of the project will be of a service character with a varied utility program. The entire building will consist of 6 hall modules, including administrative, sanitary and social facilities and office spaces with a varied area. All the spaces are intended for renting out differentiated service activities in accordance with MPZP by enterprises, in particular SME sector and operating within PNT in Opolu sp. z o.o. The scope and type of construction and assembly works to be carried out are specified in the construction documentation and include: 1) General construction works in the range of zero state, reinforced concrete and masonry structure, water meter well, roof, facade, substrates and floors, partition walls, opening carpentry, wall and ceiling linings, dumpster covers; 2) Sanitary installations for connection and installation of water and sewage, gas and central heating, ventilation and air conditioning systems; 3) Electrical installations for internal electrical and external electrical installations; 4) Internal communication infrastructure in the field of secondary roads including a road and delivery area, access road, parking bays, sidewalks, fire roads. The material effects of the project, i.e. products that will be created as a result of its implementation, will be: preparation of investment areas with area. 3.00 ha, adaptation of the facility (1 pieces) to the needs of people with disabilities and increase in employment -10 people (English)
20 October 2020
0 references
Identifiers
RPOP.02.02.02-16-0001/17
0 references