Replacement of inefficient heat sources in households in Pcim- solid fuels (Q112460): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Remplacement de sources de chaleur inefficaces dans les ménages de la commune de Pcim- combustibles solides |
Revision as of 12:10, 1 December 2021
Project Q112460 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Replacement of inefficient heat sources in households in Pcim- solid fuels |
Project Q112460 in Poland |
Statements
355,819.24 zloty
0 references
363,535.44 zloty
0 references
97.88 percent
0 references
24 October 2017
0 references
30 September 2020
0 references
GMINA PCIM
0 references
Projekt dotyczy wymiany niskosprawnych kotłów węglowych na nowe energooszczędne urządzenia węglowe i wykonaniem prac w ramach instalacji wewnętrznej. Integralną częścią projektu są działania na rzecz podniesienia świadomości ekologicznej. Stary kocioł będzie zlikwidowany i zutylizowany. redukcji emisji CO2 38,08 Emisja CO2 : przed 446,7736 , po realizacji 276,65596 Mgrok redukcji emisji pyłu PM10 96,32 i PM2,5 91,69 Emisja pyłu PM10 przed 1,632442 , po realizacji 0,0601426 Mgrok i PM2,5 przed 0,687344 i po realizacji projektu 0,05713547 Mgrok.W Gminie nie ma kotłowni zbiorczej i sieci ciepłowniczej. Projekt nie zakłada podłączenia do sieci ciepłowniczej. Nie przewiduje się budowy sieci.Planuje się następujące działania informacyjne: organizacja 2 spotkań, przygotowanie ulotek i art informacyjnych na www.pcim.pl Zad 2.Odbiorcy: mieszkańcy gminy.Działania te będą promować postawy proekologiczne oraz poczucie odpowiedzialności za stan środowiska w zakresie poprawy efektywności energetycznej, oszczędności zasobów naturalnych lub obniżenia niskiej emisji. Będą obejmować tematykę: oszczędności zasobów naturalnych; obniżenia niskiej emisji; poprawy efektywności energetycznej.Gmina nie planuje przygotowania programu osłonowego.Gmina należy do obszarów, na których konieczne jest podjęcie działań naprawczych w obowiązującym POP. Przewidziana dla gminy skala likwidacji urządzeń na paliwa stałe: 1170szt.Projekt został wskazany w PGN. PGN został zaopiniowany i uzyskał potwierdzenie WFOŚiGW.Ocena jakości powietrza w województwie zalicza Gminę do obszarów przekroczeń: pyłu PM10 24 godz. oraz BaProk.Dominującą grupą paliw w sektorze gospodarstw domowych jest węgiel: 56PGN przewiduje działanie naprawcze 3 Ograniczenie zużycia energii i wytwarzanie energii z OZE budownictwo mieszkaniowe zadania 3.2 i 3.3.Projekt nie będzie realizowany na terenie miejscowości uzdrowiskowych.Projekt odpowiada na zidentyfikowane problemy. (Polish)
0 references
The project concerns the replacement of low-efficiency coal boilers for new energy-efficient coal appliances and the execution of works within the internal installation. An integral part of the project is to raise environmental awareness. The old boiler will be liquidated and disposed of. CO2 emission reduction 38.08 CO2 emissions: before 446.7736, after 276.65596 Mgrok reduction of PM10 PM10 96.32 and PM2.5 91.69 PM10 dust emissions before 1.632442, after 0.0601426 Mgrok and PM2.5 before 0.687344 and after project 0.05713547 Mgrok.There is no district boiler room and district heating network. The project does not involve connection to the district heating network. The construction of the network is not foreseen.The following information activities are planned: organisation of 2 meetings, preparation of leaflets and information articles at www.pcim.pl Receivers: these activities will promote environmentally friendly attitudes and a sense of responsibility for the state of the environment in terms of improving energy efficiency, saving natural resources or reducing low emissions. It will cover the following topics: saving natural resources; reductions in low emissions; improving energy efficiency.The commune does not plan to prepare a cover programme.The commune is one of the areas where corrective action is needed in the existing POP. The scale of liquidation of solid fuel equipment provided for by the municipality: 1170pcs.The project is indicated in PGN. PGN has been reviewed and received confirmation of WFOŚiGW.Assessment of air quality in the voivodship includes the Municipality among the areas of exceedance: PM10 dust 24 hours and BaProk.The dominant group of fuels in the household sector is coal: 56PGN provides for a remedial action 3 Reducing energy consumption and power generation from RES residential construction tasks 3.2 and 3.3.The project will not be implemented in the spa towns.The project responds to the identified problems. (English)
20 October 2020
0 references
Identifiers
RPMP.04.04.03-12-0222/17
0 references