Construction of sanitary sewage system in Bełżec, Kolektor KP-1 – continuation (Q105589): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Construction d’un réseau d’assainissement sanitaire à Bełżec, collecteur KP-1 — continuation |
Revision as of 09:53, 1 December 2021
Project Q105589 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of sanitary sewage system in Bełżec, Kolektor KP-1 – continuation |
Project Q105589 in Poland |
Statements
2,913,780.39 zloty
0 references
4,570,635.91 zloty
0 references
63.75 percent
0 references
24 July 2015
0 references
31 December 2020
0 references
GMINA BEŁŻEC
0 references
Celem głównym projektu jest "Poprawa stanu gospodarki ściekowej na terenie Gminy Bełżec przyczyniająca się do minimalizacji zagrożeń epidemiologicznych oraz zmniejszenie zanieczyszczenia środowiska naturalnego". Realizacja projektu umożliwi poprawę stanu infrastruktury technicznej (kanalizacja) oraz zapobiegnie degradacji środowiska naturalnego, które stanowi podstawę potencjału rozwoju Gminy i wpływa zdecydowanie na podniesienie jakości życia mieszkańców. Grupą docelową, która odniesie bezpośrednie korzyści z realizacji Projektu na poziomie jego realizacji będą: * mieszkańcy miejscowości Bełżec * instytucje oraz organizacje znajdujące się w miejscowości Bełżec * firmy, przedsiębiorcy oraz osoby prowadzące działalność gospodarczą w obrębie miejscowości Bełżec * mieszkańcy Gminy Bełżec, * instytucje oraz organizacje znajdujące się w Gminie Bełżec. Planowane przedsięwzięcie obejmuje: - wykonanie sieci kanalizacji sanitarnej podciśnieniowej z rur PE 90, PE 125, PE 160, PE 225; -wykonanie sieci grawitacyjnej z rur PCV - U -160; - wykonanie przyłączy grawitacyjnych z rur PCV - U -160; - wykonanie studni zbiorczych (zaworowych); - wykonanie studni rewizyjnych, oraz zakup i montaż prasy do odwadniania osadu nadmiernego wraz z linią do higienizacji osadu wapnem. Kanalizacja sanitarna zostanie wykonana na ulicach: Czarnieckiego, Wiejska, Kolejowa, Świerkowa, Jodłowa, Partyzantów, Reja, Piaseckiego, Leśna, Spokojna, Osiedlowa, Wrzosowa. W wyniku realizacji projektu zostaną osiągnięte poniższe wskaźniki rezultatu: 1) liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków - 540 osób 2) Przewidywana liczba osób korzystających z ulepszonego oczyszczania ścieków - 540 osób, 3) wybudowana sieć kanalizacyjna o łącznej długości 8949,50 m.4) powierzchnia terenów objęta działaniem zakupionego sprzętu - 1954,21 ha 5) Liczba wspartych stanowisk monitoringiem środowiska - 121 szt.Czarnieckiego (Polish)
0 references
The main objective of the project is “Improving the state of sewage management in the municipality of Bełżec contributing to minimising epidemiological risks and reducing environmental pollution”. The implementation of the project will make it possible to improve the state of the technical infrastructure (canalisation) and prevent the degradation of the natural environment, which forms the basis of the development potential of the municipality and significantly improves the quality of life of residents. The target group, which will benefit directly from the implementation of the Project at the level of its implementation, will be: * residents of Bełżec * institutions and organisations located in the town of Bełżec * companies, entrepreneurs and persons doing business within the town of Bełżec * residents of the commune Bełżec, * institutions and organisations located in the Bełżec Commune. The planned project shall include: — construction of a vacuum sanitary sewage system made of pipes PE 90, PE 125, PE 160, PE 225; —implementation of the gravitational net made of PVC pipes – U -160; — execution of gravitational connections made of PVC pipes – U -160; — production of aggregate wells (valve wells); — execution of inspection wells, and purchase and assembly of a press to drain excessive sludge along with a line for hygienic lime sediment. Sanitary Sewerage will be made on the streets: Czarniecki, Rural, Kolejowa, Świerkowa, Jodłowa, Partyzantów, Reja, Piasecki, Leśna, Spokojna, Osiedlowa, Wrzosowa. The following result indicators will be achieved as a result of the project: 1) number of additional persons benefiting from improved waste water treatment – 540 persons 2) The estimated number of persons benefiting from improved waste water treatment – 540 persons, 3) built sewage network with a total length of 8949.50 m.4) area of land covered by the operation of purchased equipment – 1954.21 ha 5) Number of supported environmental monitoring stations – 121 pieces of Czarniecki (English)
17 October 2020
0 references
Identifiers
RPLU.06.04.00-06-0010/15
0 references