Improvement of the water and sewage system of the municipality and reconstruction of the sewage treatment plant in Wąwolnica (Q105583): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 12:00, 29 October 2020
Project Q105583 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of the water and sewage system of the municipality and reconstruction of the sewage treatment plant in Wąwolnica |
Project Q105583 in Poland |
Statements
3,429,701.87 zloty
0 references
4,034,943.42 zloty
0 references
85.0 percent
0 references
26 October 2015
0 references
30 July 2021
0 references
GMINA WĄWOLNICA
0 references
Celem głównym projektu jest zapewnienie ciągłości dostaw wody oraz odbioru ścieków na terenie gminy Wąwolnica. Kluczowe rezultaty: Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków 1156 RLM Liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę 2568 Grupę docelową projektu stanowią odbiorcy usług w zakresie zaopatrzenia w wodę oraz odbioru ścieków. Rezultaty zostaną osiągnięte w wyniku zrealizowania zakresu projektu: 1. Rozbudowa i modernizacja oczyszczalni ścieków w Wąwolnicy 2.1. Przebudowa ( modernizacja) ujęcia wody w Wąwolnicy 2.2. Rozbudowa sieci wodociągowej w ulicy Bełżyckiej w Wąwolnicy 2.3. Modernizacja - remont pompowni wody w msc. Łopatki 2.4. Modernizacja - remont pompowni wody w msc. Grabówki 2.5. System inkasent dla msc. Zarzeka 2.6. Serwis internetowy w celu oceny poziomu satysfakcji użytkowników z otrzymanych usług 3. Modernizacja - remont przepompowni ścieków na sieci kanalizacji sanitarnej w msc. Zarzeka i Wąwolnica Budynki leżące w obrębie projektowanej inwestycji zaopatrywane są obecnie w wodę ze stacji wodociągowej w Wąwolnicy w systemie grawitacyjnym. Istniejąca sieć grawitacyjna nie dostarcza dla w/.w odbiorców wody pod wymaganym ciśnieniem. W celu poprawienia parametrów ciśnieniowych dostarczanej wody i spełnienia warunków pożarowych przewiduje się wykonanie nowej sieci wodociągowej ciśnieniowej, do której woda tłoczona będzie ciśnieniowo poprzez zestaw hydroforowy zamontowany w budynku stacji wodociągowej. Zapotrzebowanie wody na cele bytowo-gospodarcze nie zmieni się do czasu włączenia do sieci wodociągowej nowej zabudowy. Przewiduje się przyszłościowo zwiększenie zapotrzebowania wody dla nowych odbiorców w ilości 2 m3/d, łącznie z istniejącymi odbiorcami do 5 m3/d. Sieć wodociągową zaprojektowano z rur PE 110/10 na ciśnienie 1,25 MPa o długości łącznej 762 m łączonych przez zgrzewanie. Z uwagi na konieczność wykonania przewiertów sterowanych sieć jest projektowana w technologii mieszanej. (Polish)
0 references
The main objective of the project is to ensure continuity of water supply and wastewater collection in the municipality of Wąwolca. Key results: Number of additional persons benefiting from improved waste water treatment 1156 RLM The number of additional persons benefiting from improved water supply 2568 The target group of the project is the recipients of water supply and waste water collection services. The results will be achieved as a result of the implementation of the scope of the project: 1. Extension and modernisation of the sewage treatment plant in Wąwolnica 2.1. Reconstruction (modernisation) of water intake in Wąwolnica 2.2. Expansion of the water supply network in Bełżycka Street in Wąwolnica 2.3. Modernisation – renovation of the water pumping station in the city. Shoulder blades 2.4. Modernisation – renovation of the water pumping station in the city. It’s a 2.5 graft. Collection system for vengeance. He swears 2.6. Internet Service to assess the level of satisfaction of users with the services received 3. Modernisation – overhaul of sewage pumping plant on sanitary sewage system in the city. The buildings within the project are now supplied with water from the water supply station in Wąwolnica in the gravity system. The existing gravitational grid does not provide water under the required pressure for w/w customers. In order to improve the pressure parameters of the water supplied and to meet the conditions of fire, a new pressure water supply system is envisaged, to which the water will be pressed through the hydrophoric assembly installed in the water station building. The need for water for economic and living purposes will not change until new buildings are included in the water supply network. A future increase in water demand for new customers in the amount of 2 m³/d, including existing customers to 5 m³/d. The water supply network is designed from PE 110/10 pipes for a pressure of 1.25 MPa with a total length of 762 m combined by welding. Due to the need to produce controlled drills, the network is designed in mixed technology. (English)
17 October 2020
0 references
Identifiers
RPLU.06.04.00-06-0006/17
0 references