Łódź forge of construction personnel (Q103910): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Łódzka forge personnel de construction

Revision as of 08:57, 1 December 2021

Project Q103910 in Poland
Language Label Description Also known as
English
Łódź forge of construction personnel
Project Q103910 in Poland

    Statements

    0 references
    403,334.56 zloty
    0 references
    96,800.29 Euro
    13 January 2020
    0 references
    474,511.25 zloty
    0 references
    113,882.7 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 February 2017
    0 references
    31 January 2018
    0 references
    ETURIA SP. Z O.O./ETURIA SP Z O.O.-KUŹNIA KADR
    0 references
    0 references
    0 references
    "Łódzka kuźnia kadr budowlanych" to projekt skierowany do 192 osób dorosłych z obszaru woj. łódzkiego zainteresowanych podniesieniem kwalifikacji zawodowych poprzez udział w pozaszkolnych formach kształcenia ustawicznego. Projekt realizowany będzie na obszarze woj. łódzkiego w okresie 01.02.2017 - 31.01.2018 r. Kursy oferowane w ramach projektu odpowiadają na potrzeby łódzkiego rynku budowlanego i organizowane są we współpracy z lokalnymi przedsiębiorcami prowadzącymi działalność m.in. w Łódzkiej Specjalnej Strefie Ekonomicznej. W ramach projektu przewiduje się realizację kursów umożliwiających uzyskiwanie i uzupełnianie wiedzy, umiejętności i kwalifikacji zawodowych, zgodnych z Rozporządzeniem MEN z dnia 11 stycznia 2012 r. w sprawie kształcenia ustawicznego w formach pozaszkolnych. Szkolenia będą równoległe prowadzone w dwóch blokach tematycznych - kursy A i B dla osób zainteresowanych nabyciem uprawnień instalatorskich (Elektryk budowlany ze specjalnością montera systemów fotowoltaicznych lub systemów fotowoltaicznych) oraz kursy C i D dla osób zainteresowanych nabyciem kwalifikacji do wykonywania prac projektantów budowlanych w programach Autodesk Inventor lub Autodesk Revit Architecture. Celem głównym projektu jest nabycie przez 174 UP (27 K, 147 M) spośród 192 osób dorosłych (32 K, 160 M) z obszaru woj. łódzkiego, kwalifikacji zawodowych uprawniających do wykonywania czynności elektryków budowlanych wraz ze specjalnościami montera sieci światłowodowych lub systemów fotowoltaicznych (86 O, 10 K, 76 M) oraz projektantów budowlanych w środowisku Autodesk Inventor lub Revit (88 O, 17 K, 71 M) do 31.01.2018 r. (Polish)
    0 references
    “Lodz forge of construction personnel” is a project addressed to 192 adults from the Łódź Voivodeship interested in raising professional qualifications through participation in non-school forms of lifelong learning. The project will be implemented in the Łódź Voivodeship in the period 01.02.2017-31.01.2018. The courses offered as part of the project meet the needs of the Łódź construction market and are organised in cooperation with local entrepreneurs operating in, among others, the Łódź Special Economic Zone. The project envisages the implementation of courses enabling the acquisition and complementing of knowledge, skills and professional qualifications, in accordance with the MEN Regulation of 11 January 2012 on lifelong learning in out-of-school forms. The trainings will be carried out in parallel in two thematic blocks – courses A and B for those interested in acquiring installation rights (Construction Electricity with a specialty of photovoltaic system installer or photovoltaic systems) and courses C and D for those interested in acquiring qualifications to perform construction designers’ work in Autodesk Inventor or Autodesk Revit Architecture. The main objective of the project is to acquire by 174 UP (27 K, 147 M) out of 192 adults (32 K, 160 M) from the area of Łódź Voivodeship, professional qualifications to perform construction electrical activities together with specialties of the installer of fibre optic networks or photovoltaic systems (86 O, 10 K, 76 M) and construction designers in the Autodesk Inventor or Revit environment (88 O, 17 K, 71 M) until 31.01.2018. (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.11.03.01-10-0073/16
    0 references