CONSTRUCTION OF A LOCAL ROAD WITH THE NECESSARY TECHNICAL INFRASTRUCTURE TO OPEN INVESTMENT AREAS, LOCATED IN TOMASZÓW MAZOWIECKI AND TOMASZÓW MAZOWIECKI COMMUNE, CONNECTING EXPRESSWAY NO. 8 AS PART OF THE TEN-T NETWORK (Q101715): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
CONSTRUCTION D’UNE ROUTE LOCALE AVEC L’INFRASTRUCTURE TECHNIQUE NÉCESSAIRE POUR OUVRIR DES ZONES D’INVESTISSEMENT SITUÉES DANS LA VILLE DE TOMASZÓW MAZOWIECKI ET LA COMMUNE DE TOMASZÓW MAZOWIECKI, RELIANT L’AUTOROUTE NO 8 DANS LE CADRE DU RÉSEAU DIX-T

Revision as of 08:28, 1 December 2021

Project Q101715 in Poland
Language Label Description Also known as
English
CONSTRUCTION OF A LOCAL ROAD WITH THE NECESSARY TECHNICAL INFRASTRUCTURE TO OPEN INVESTMENT AREAS, LOCATED IN TOMASZÓW MAZOWIECKI AND TOMASZÓW MAZOWIECKI COMMUNE, CONNECTING EXPRESSWAY NO. 8 AS PART OF THE TEN-T NETWORK
Project Q101715 in Poland

    Statements

    0 references
    8,802,825.4 zloty
    0 references
    2,112,678.10 Euro
    13 January 2020
    0 references
    10,356,265.19 zloty
    0 references
    2,485,503.65 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2014
    0 references
    30 November 2018
    0 references
    GMINA MIASTO TOMASZÓW MAZOWIECKI
    0 references
    0 references

    51°31'10.2"N, 20°2'1.7"E
    0 references
    CEL: POPRAWA DOSTĘPNOŚCI TRANSPORTOWEJ WOJ. ŁÓDZKIEGO, POPRZEZ BUDOWĘ DROGI LOKALNEJ ŁĄCZĄCEJ DROGĘ EKSPRESOWĄ NR 8 STANOWIĄCĄ ELEMENT SIECI TENT, PRZY UWZGLĘDNIENIU ZASAD ZRÓWNOWAŻONEGO ROZWOJU GOSPODARCZEGO I SPOŁECZNEGO. DŁUG. PRZEDM. ODCINKA 2,38 KM. W WYNIKU WDROŻENIA PROJ. NASTĄPI: POPRAWA BEZPIECZEŃSTWA RUCHU KOŁOWEGO I PIESZEGO, POPRAWA POWIĄZAŃ REGIONALNEJ SIECI DRÓG WOJ. ŁÓDZKIEGO Z SIECIĄ DRÓG KRAJOWYCH I TRANSEUROPEJSKĄ SIECIĄ TRANSPORTOWĄ TEN-T, POPRAWA DOSTĘPNOŚCI DO TERENÓW INWESTY., OGRANICZENIE NEGATYWNEGO ODDZIAŁYWANIA INFRASTRUKTURY DROGOWEJ NA STAN I JAKOŚĆ ŚRODOWISKA NATURALNEGO. WDROŻENIE PROJ. ZAPEWNI ZNACZĄCĄ POPRAWĘ WARUNKÓW ŻYCIA NA DANYM TERENIE, ORAZ BĘDZIE POZYTYWNIE ODDZIAŁYWAĆ NA CAŁY REGION W ASPEKCIE: TWORZENIA WARUNKÓW DO ROZWOJU GOSPODARCZEGO., ZWIĘKSZANIA ATRAKCYJNOŚCI INWESTYCYJNEJ WOJ. ŁÓDZKIEGO, OGRANICZANIA DYSPROPORCJI ROZWOJOWYCH. ZADANIA: ZAD. 1 PRZYGOTOWANIE PROJEKTU - DOKUMENTACJA TECHNICZNA., SW. ZAD. 2 ROBOTY BUDOWLANE - BRANŻA DROGOWA – DROGA DOJAZDOWA, OBIEKTY INŻYNIERSKIE (MOST PRZEPUSTY), URZĄDZENIA OCHRONY ŚROD., BEZP. RUCHU, WYCINKA DRZEW, DR. SERWISOWA, (NIEKWALIF. WŁĄCZENIE DROGI W WĘZEŁ S8 - GM. TMAZ., PLAC DO OBSŁUGI TŁOCZNI - GM. M. TMAZ). BRANŻA SANITARNA – KANALIZACJA DESZCZOWA, ZBIORNIK RETENCYJNY, ZABEZPIECZENIE NAD GAZOCIĄGIEM (NIEKWALIF. – KANAL. DESZCZ. NA WŁĄCZENIU W S8 - GM. TMAZ, KANAL. SANITARNA, WODOCIĄG, VAT OD KANAL. DESZCZOWA. - GM. M. TMAZ.) BRANŻA ELEKTROENERGETYCZNA – OŚWIETLENIE ULICZNE, USUNIĘCIE KOLIZJI SIECI 15KV I NN Z DROGĄ (NIEKWALIF. – PRZEBUDOWA LINII 15KV, ZASILANIE TŁOCZNI ŚCIEKÓW, ZASILANIE DO TER. INWEST.OŚWIET. ULICZ.NA WŁĄCZENIU W S8 - GM. TMAZ., ZASILANIE TŁOCZNI - GM. M. TMAZ.) ZAD. 3 ZARZĄDZANIE PROJEKTEM - NADZÓR INWESTORSKI. NADZÓR AUTORSKI. PROMOCJA PROJ. (TABLICE INFORMACYJNE I PROMOCYJNE, OGŁ. W PRASIE LOKALNEJ). GRUPY DOCELOWE: WSZYSCY UŻYTKOWNICY KORZYSTAJĄCY Z WYBUDOWANEJ INFRASTRUKTURY DROGOWEJ: MIESZKAŃCY G I M. TM., POWIATU TOMASZ., TURYŚCI, PRZEDSIĘ (Polish)
    0 references
    OBJECTIVE: IMPROVING TRANSPORT ACCESSIBILITY OF WARS. ŁÓDŹ, THROUGH THE CONSTRUCTION OF A LOCAL ROAD CONNECTING EXPRESSWAY NO. 8, WHICH IS PART OF THE TENT NETWORK, TAKING INTO ACCOUNT THE PRINCIPLES OF SUSTAINABLE ECONOMIC AND SOCIAL DEVELOPMENT. IT’S A DEBT. IT’S THE FRONT. A DISTANCE OF 2.38 KM. AS A RESULT OF THE PROJECT IMPLEMENTATION. THE FOLLOWING WILL BE: IMPROVING THE SAFETY OF ROAD AND PEDESTRIAN TRAFFIC, IMPROVING THE LINKS OF THE REGIONAL ROAD NETWORK. LODZ WITH THE NETWORK OF NATIONAL ROADS AND THE TRANS-EUROPEAN TRANSPORT NETWORK TEN-T, IMPROVING ACCESSIBILITY TO THE AREAS OF INVESTMENT., LIMITING THE NEGATIVE IMPACT OF ROAD INFRASTRUCTURE ON THE STATE AND QUALITY OF THE ENVIRONMENT. IMPLEMENTATION OF THE PROJECT. IT WILL PROVIDE A SIGNIFICANT IMPROVEMENT IN LIVING CONDITIONS IN THE AREA AND WILL HAVE A POSITIVE IMPACT ON THE WHOLE REGION IN TERMS OF: CREATING CONDITIONS FOR ECONOMIC DEVELOPMENT, INCREASING INVESTMENT ATTRACTIVENESS OF THE VOIVODSHIPS. LODZ, LIMITING DEVELOPMENT IMBALANCES. TASKS: IT’S THE ASS. 1 PREPARATION OF THE PROJECT – TECHNICAL DOCUMENTATION., SW. IT’S THE ASS. 2 CONSTRUCTION WORKS – ROAD INDUSTRY – ACCESS ROAD, ENGINEERING FACILITIES (BRIDGE OF CULVERTS), SECURITY EQUIPMENT WEDNESDAY, AMP. TRAFFIC, TREE CUTTING, SERVICE DOCTOR, (NIEKWALIF. INTEGRATION OF THE ROAD INTO THE JUNCTION S8 – GM. TMAZ., GM. M. TMAZ. SANITARY INDUSTRY – RAINWATER DRAINAGE, STORAGE TANK, PROTECTION OVER THE GAS PIPELINE (NOKWALIF. — A SEWER. IT’S RAINING. ON SWITCHING IN S8 – GM. TMAZ, CHANNEL. SANITARY, WATER SUPPLY, VAT ON THE SEWER. IT’S RAINY. — GM.M. TMAZ.) POWER INDUSTRY – STREET LIGHTING, REMOVAL OF COLLISIONS OF 15KV AND NN NETWORKS WITH THE ROAD (NIEKWALIF. — RECONSTRUCTION OF 15KV LINE, POWER SUPPLY OF SEWAGE PRESSING PLANTS, POWER TO TER. IT’S AN INVEST. ULICZ.NA SWITCHED ON IN S8 – GM.TMAZ., POWER SUPPLY OF THE PRESSING PLANT – GM.M. TMAZ. 3 PROJECT MANAGEMENT – INVESTOR SUPERVISION. IT’S COPYRIGHT SUPERVISION. PROMOTION OF THE PROJECT. (INFORMATION AND PROMOTIONAL TABLES, A.K.A. IN THE LOCAL PRESS). TARGET GROUPS: ALL USERS USING BUILT-IN ROAD INFRASTRUCTURE: RESIDENTS OF G AND M. TM., COUNTY TOMASZ., TOURISTS, ENTER (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.03.02.02-10-0016/15