EXTENSION OF THE PROVINCIAL ROAD NR702 – UL. PITKOWSKA IN ZGIRZ (Q101683): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
EXTENSION DE LA ROUTE RÉGIONALE NR702 — UL. PIĄTKOWSKA À ZGIERZ

Revision as of 08:28, 1 December 2021

Project Q101683 in Poland
Language Label Description Also known as
English
EXTENSION OF THE PROVINCIAL ROAD NR702 – UL. PITKOWSKA IN ZGIRZ
Project Q101683 in Poland

    Statements

    0 references
    4,601,757.81 zloty
    0 references
    1,104,421.87 Euro
    13 January 2020
    0 references
    5,413,832.77 zloty
    0 references
    1,299,319.86 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 April 2016
    0 references
    31 December 2017
    0 references
    WOJEWÓDZTWO ŁÓDZKIE
    0 references
    0 references

    51°51'19.8"N, 19°23'26.2"E
    0 references
    Realizacja proj. wynika z potrzeby zwiększenia dostępności transportowej województwa łódzkiego w ruchu drogowym. Celem realizacji inwestycji jest: poprawa warunków technicznych, przepustowości i bezpieczeństwa ruchu kołowego (tranzytowego i lokalnego) i pieszego, dostosowanie nośności drogi do wymagań obowiązujących przepisów oraz poprawa warunków ekologicznych. Realizacja inwestycji służyć będzie zarówno mieszkańcom, którzy w celach zawodowych lub rekreacyjnych korzystają z niej, jak i osobom, przybywającym spoza regionu w celach turystycznych bądź biznesowych. Użytkownikami drogi są także przewoźnicy, kierowcy zawodowi, przedsiębiorcy, turyści przejeżdżający DW 702. Zakres inwestycji obejmuje rozbudowę DW 702 w Zgierzu na odcinku od km 42+300 do km 43+455,15.(1,155km):-rozbiórkę i budowę jezdni drogi wojewódzkiej(Rb,);-rozbudowę i przebudowę skrzyżowań (rb);-budowę zatok autobusowych (rb); -rozbiórkę i budowę chodników (rb);-rozbiórkę i budowę zjazdów (rb);-budowę i przebudowę kanalizacji deszczowej (rb);-budowę i przebudowę oświetlenia drogowego (prz. Inf.);-remont wiaduktu nad linią kolejową; (rb- nk)-przebudowę sieci: elektroenergetycznej, teletechnicznej (prz. Inf..);-przebudowę dróg: powiatowych, gminnych.(rb) Ponadto w ramach przedsięwzięcia planuje się wykonanie prac takich jak wykonanie elementów organizacji ruchu w tym sygnalizacji świetlnej oraz wycinki zieleni. oraz remont chodnika. W ramach projektu realizowane będą usługi związane z:- opracowaniem SW–firma zewnętrzna; - nadzorem inwestorskim-wykonywane przez pracowników ZDW,- nadzór autorski- firma zewnętrzna; - promocja projektu – wyk. tablic infor/pam., program telewizyjny infor. W projekcie przyjęta została typowa technologia wykonania robót i odpowiednie rozwiązania konstrukcyjne. Proponowane rozwiązanie projektowe jest optymalne, a zaplanowane wydatki niezbędne do realizacji projektu i osiągnięcia celów. Szczegóły dotyczące parametrów technicznych drogi i rozwiązań technologicznych opisano w SW. (Polish)
    0 references
    Implementation of the project results from the need to increase transport accessibility of the Łódź Voivodeship in road traffic. The purpose of the investment is to: improve the technical conditions, capacity and safety of road traffic (transit and local) and pedestrians, adapt the load capacity of the road to the requirements of existing legislation and improve environmental conditions. The implementation of the investment will serve both residents who use it for professional or recreational purposes, as well as those coming from outside the region for tourism or business purposes. The road users are also carriers, professional drivers, entrepreneurs, tourists passing through DW 702. The scope of the investment includes the expansion of DW 702 in Zgirz on the section from km 42 + 300 to km 43+ 455.15.(1.155 km):- demolition and construction of the voivodeship road (Rb,);-development and reconstruction of intersections (rb);-construction of bus bays (rb); — demolition and construction of sidewalks (rb);- demolition and construction of downhills (rb);-construction and reconstruction of rainwater drainage (rb);-construction and reconstruction of road lighting (p. INF.);-repair of the overpass over the railway line; (rb- nk)-construction of the network: power and telecommunication (e.g. INF..);-reconstruction of roads: (rb) In addition, as part of the project, works are planned to be carried out, such as the execution of elements of traffic organisation including traffic signalling and cutting of greenery. The project will provide services related to:- development of SW-external company; — investor supervision-performed by employees of ZDW,- copyright supervision- an external company; — promotion of the project – infor/pam. boards, TV programme infor. The project adopted a typical construction technology and appropriate construction solutions. The proposed design solution is optimal, and the planned expenditure necessary to achieve the project and achieve the objectives. Details of technical parameters of the road and technological solutions are described in SW. (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.03.02.01-10-0001/16
    0 references