Creation of an innovative system of sediment management and water treatment for the needs of the Minsk Mazowiecki agglomeration (Q85268): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 06:13, 29 October 2020
Project Q85268 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Creation of an innovative system of sediment management and water treatment for the needs of the Minsk Mazowiecki agglomeration |
Project Q85268 in Poland |
Statements
39,796,151.47 zloty
0 references
46,819,001.74 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
30 June 2022
0 references
PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SP. Z O.O. W MIŃSKU MAZOWIECKIM
0 references
Projekt realizowany w granicach aglomeracji Mińsk Mazowiecki o wielkości 57 722 RLM. Zakres projektu: • Modernizacja oczyszczalni w Mińsku Mazowieckim o przepustowości Q=82 200 RLM, roboty obejmują część mechaniczną, biologiczną oraz węzeł gospodarki osadowej – zwiększenie przepustowości instalacji osadowej oraz efektywności jej pracy wynikająca z potrzeb dostosowania obiektów/instalacji do ilości wytwarzanego osadu. • Budowa nowej SUW nr1 z zapleczem przy ul. Mireckiego, wydajność Q=120 m3/h • Modernizacja SUW „Kędzierak” przy ul. Kołbielskiej, wydajność Q=300 m3/h • Wdrożenie zintegrowanego systemu zarządzania infrastrukturą sieciową, w tym stworzenie Centralnej Dyspozytorni, powiązanie systemu zarządzania siecią z aplikacjami zarządczymi, rozbudowa systemu SCADA, wdrożenie i udoskonalenie Systemu GIS, modernizacja automatyki, studni wydobywczych wody surowej opracowaniem hydraulicznego modelu sieci i systemu monitoringu przepływów na sieci. (Polish)
0 references
The project is carried out within the limits of the Mińsk Mazowiecki agglomeration with the size of 57 722 RLM. Scope of the project: • Modernisation of the treatment plant in Minsk Mazowiecki with capacity Q=82 200 RLM, robots include mechanical, biological and sediment economy node – increasing the capacity of the sludge installation and the efficiency of its operation resulting from the need to adapt the facilities/installation to the amount of sludge produced. • Construction of the new SUW No.1 with the facilities at ul. Mireckiego, performance Q=120 m³/h • Modernisation of the SUW “Kędzierak” at ul. Kołbielska, performance Q=300 m³/h • Implementation of an integrated network infrastructure management system, including the creation of a Central dispatcher, linking the network management system to management applications, expansion of the SCADA system, implementation and improvement of the GIS system, modernisation of automation, raw water extraction wells development of hydraulic network model and network flow monitoring system. (English)
14 October 2020
0 references
Identifiers
POIS.02.03.00-00-0062/17
0 references