Modernisation of district heating networks by replacing channel and overhead networks with pre-insulated pipe technology in Gorzów Wlkp. (Q84816): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 06:08, 29 October 2020
Project Q84816 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of district heating networks by replacing channel and overhead networks with pre-insulated pipe technology in Gorzów Wlkp. |
Project Q84816 in Poland |
Statements
7,190,000.0 zloty
0 references
15,329,854.95 zloty
0 references
46.9 percent
0 references
21 December 2016
0 references
31 December 2021
0 references
PGE ENERGIA CIEPŁA SPÓŁKA AKCYJNA
0 references
Cele projektu Ze względu na wiek poszczególnych elementów systemu ciepłowniczego (sieci ciepłowniczych i węzłów cieplnych) oraz na zastosowanie przestarzałych technologii (dostępnych w okresie budowy), w tym: - budowa sieci w technologii kanałowej, - zastosowanie technologii węzłów grupowych, efektywność energetyczna aktualnego systemu ciepłowniczego jest niska, a jego awaryjność wzrasta. Zidentyfikowane problemy, związane z zastosowaniem grupowych węzłów cieplnych, a tym samym niskoparametrowych sieci ciepłowniczych, to: - wysokie straty ciepła na przesyle, - awaryjność systemu, - brak ekonomicznie uzasadnionej możliwości termomodernizacji budynków, - pogłębiające się ubóstwo energetyczne osób zamieszkujących budynki podłączone do węzłów grupowych. Główny cel planowanego przedsięwzięcia to efektywna i niskoemisyjna dystrybucja ciepła w Gorzowie Wielkopolskim. (Polish)
0 references
Objectives of the project Due to the age of individual components of the heating system (heat networks and heat nodes) and the use of obsolete technologies (available during the construction period), including: — the construction of networks in channel technology, – the use of group nodes technology, the energy efficiency of the current heating system is low, and its failure is increasing. The identified problems related to the use of group heat nodes and thus low-parameter heating networks are: — high heat losses on transmissions, – failure of the system, – no economically justified possibility of thermal modernisation of buildings, – worsening energy poverty of people living in buildings connected to group nodes. The main objective of the planned project is the efficient and low-carbon distribution of heat in Gorzów Wielkopolski. (English)
14 October 2020
0 references
Identifiers
POIS.01.05.00-00-0017/16
0 references