The Two-Creature Gas pipeline (Q86134): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Gazoduc Tworóg-Tworzeń |
Revision as of 21:27, 30 November 2021
Project Q86134 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | The Two-Creature Gas pipeline |
Project Q86134 in Poland |
Statements
218,673,195.0 zloty
0 references
1 January 2014
0 references
30 September 2021
0 references
OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
0 references
Przedmiotem projektu jest budowa gazociągu DN1000 MOP 8,4MPa o długości 55 km na odcinku od projektowanego węzła Tworóg (realizowanego w ramach projektu Kędzierzyn – Tworóg: województwo śląskie, powiat tarnogórski) do zespołu zaporowo - upustowego Tworzeń (województwo śląskie, miasto Dąbrowa Górnicza) wraz z infrastrukturą: 5 zespołów zaporowo-upustowych na trasie gazociągu, urządzenia ochrony katodowej, system łączności i sterowania – linia światłowodowa, przyłącza energetyczne. (Polish)
0 references
The subject of the project is the construction of the DN1000 ILO 8.4MPa gas pipeline with a length of 55 km from the Tworóg node (implemented within the framework of the Kędzierzyn – Tworóg project: śląskie voivodship, Tarnogórski county) to the dam-off team of Tworzeń (Silesian Voivodeship, City of Dąbrowa Górnicza) together with infrastructure: 5 firewall systems along the pipeline route, cathode protection devices, communication and control system – fiber optic line, power connections. (English)
14 October 2020
0 references
Identifiers
POIS.07.01.00-00-0016/17
0 references