II/388 Beaver – Choose, 1st section (Q74873): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 

Revision as of 03:52, 29 October 2020

Project Q74873 in Czech Republic
Language Label Description Also known as
English
II/388 Beaver – Choose, 1st section
Project Q74873 in Czech Republic

    Statements

    0 references
    74,089,688.43 Czech koruna
    0 references
    2,963,587.54 Euro
    10 January 2020
    0 references
    87,164,339.34 Czech koruna
    0 references
    3,486,573.57 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    6 October 2015
    0 references
    1 February 2017
    0 references
    2 March 2017
    0 references
    Kraj Vysočina
    0 references

    49°24'8.6"N, 15°35'7.1"E
    0 references
    58601
    0 references
    Předmětem projektu je modernizace komunikace II/388 Bobrová - Zvole, 1. úsek, která navazuje na již rekonstruovaný 2. úsek v intravilánu v obci Zvole nad Perštejnem, který se nachází v pasportním km 25,843 a končí v km 26,281 a byl realizován roce 2015 z vlastních zdrojů žadatele. Projekt řeší nevyhovující technické parametry komunikace, které neodpovídají současným dopravním požadavkům. Celková délka modernizace je 3,681 km a základní návrhová kategorie komunikace II/388 je S 6,5/50. (Czech)
    0 references
    The object of the project is modernisation of the communication II/388 Bobrová – Zvole, the 1st section that follows the already reconstructed 2nd section in the intravilan in the village of Zvole nad Perštejnem, which is located on the passport km 25.843 and ends in km 26.281 and was realised in 2015 from the applicant’s own resources. The project solves unsatisfactory technical parameters of communication that do not meet current transport requirements. The total length of the modernisation is 3.681 km and the basic design category of communication II/388 is S 6,5/50. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.1.42/0.0/0.0/15_002/0000808
    0 references