Renewal and optimisation of system infrastructure for SF7+ in Centre II. (Q71432): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Restauration et optimisation de l’infrastructure du système pour SF7+ au Centre II.

Revision as of 00:52, 29 November 2021

Project Q71432 in Czech Republic
Language Label Description Also known as
English
Renewal and optimisation of system infrastructure for SF7+ in Centre II.
Project Q71432 in Czech Republic

    Statements

    0 references
    0 references
    8,732,119.7 Czech koruna
    0 references
    349,284.79 Euro
    1 October 2020
    0 references
    10,273,082.0 Czech koruna
    0 references
    410,923.28 Euro
    1 October 2020
    0 references
    85 percent
    0 references
    1 April 2019
    0 references
    31 December 2019
    0 references
    Centrum pro regionální rozvoj České republiky
    0 references
    0 references
    0 references

    50°5'7.1"N, 14°27'56.5"E
    0 references
    13000
    0 references
    V rámci projektu se jedná o disková pole - stávající disková pole nelze již plnohodnotně optimalizovat, protože není dostatečná kapacita a zároveň by došlo k zastavení celého systému na několik hodin, FC switche - nelze aktualizovat ani povýšit přenosovou rychlost, firewally - výběhový typ, výrobce již nepodporuje v plném rozsahu. Nahrazením těchto komponent dojde k zajištění funkčnosti a dostupnosti infrastruktury SF7+ na následující roky v rámci požadované udržitelnosti. (Czech)
    0 references
    Within the project these are disk arrays – the existing disk arrays cannot be fully optimised because there is insufficient capacity and at the same time the whole system would be stopped for several hours, FC switches – it is not possible to update or increase the transfer rate, firewalls – the runway type, the manufacturer no longer supports the full range. Replacing these components will ensure the functionality and availability of the SF7+ infrastructure for the following years within the required sustainability. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.08.2.125/0.0/0.0/15_002/0000182
    0 references