WWTP and sewerage system Malovice and Malovičky (Q61205): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q214250 was merged with Q4860)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 15:24, 27 December 2020

Project Q61205 in Czech Republic
Language Label Description Also known as
English
WWTP and sewerage system Malovice and Malovičky
Project Q61205 in Czech Republic

    Statements

    0 references
    16,865,251.2 Czech koruna
    0 references
    674,610.05 Euro
    10 January 2020
    0 references
    26,455,296.0 Czech koruna
    0 references
    1,058,211.84 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    31 July 2021
    0 references
    Obec Malovice
    0 references
    0 references
    0 references

    49°2'46.54"N, 14°11'53.66"E
    0 references
    38411
    0 references
    Stávající stav systému čištění odpadních vod v Malovicích a Malovičkách je nevyhovující. Čištění splašků probíhá v septicích a kanalizace je vyústěna do Malovického rybníka. Je navrženo vybudování nové ČOV (kapacita 400 EO) s podchycením stávajících volných výustí přes odlehčovací komory vybudované na stávávajících kanalizačních řadech. Propojení kanalizační sítě z Malovic do Maloviček bude zajištěno výtlačným řadem. Na projekt je vydáno SP s plánem nabytí právní moci 31.1.2018. (Czech)
    0 references
    The current state of the sewage treatment system in Malovice and Malovičky is unsatisfactory. Sewage cleaning is carried out in septic tanks and the sewerage is located in Malovice pond. The construction of a new wastewater treatment plant (capacity 400 EO) is proposed with the capacitance of existing free drains through the endurance chambers built on becoming sewer lines. The connection of the sewer network from Malovice to Maloviček will be ensured by the extrusion line. SP is issued for the project with a plan to acquire legal power 31.1.2018. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_071/0007281
    0 references