TŘEBOŇ, OLD CLAY – DRAINAGE AND WWTP (Q59912): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q214250 was merged with Q4860)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 15:36, 27 December 2020

Project Q59912 in Czech Republic
Language Label Description Also known as
English
TŘEBOŇ, OLD CLAY – DRAINAGE AND WWTP
Project Q59912 in Czech Republic

    Statements

    0 references
    12,998,436.93 Czech koruna
    0 references
    519,937.48 Euro
    10 January 2020
    0 references
    20,389,705.0 Czech koruna
    0 references
    815,588.20 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    1 October 2016
    0 references
    31 March 2019
    0 references
    Město Třeboň
    0 references
    0 references
    0 references

    49°1'12.61"N, 14°45'44.53"E
    0 references
    37901
    0 references
    Obsahem projektu je výstavba ČOV a splaškové kanalizace (s jednou čerpací stanicí) ve Staré Hlíně - místní části města Třeboně. Na novou kanalizaci bude napojeno 243 trvale žijících obyvatel. ČOV je navržena o kapacitě 304 EO. (Czech)
    0 references
    The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/15_021/0001266
    0 references