Children’s group Koumáci (Q55188): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q214255 was merged with Q4859)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 16:22, 27 December 2020

Project Q55188 in Czech Republic
Language Label Description Also known as
English
Children’s group Koumáci
Project Q55188 in Czech Republic

    Statements

    0 references
    2,817,342.0 Czech koruna
    0 references
    112,693.68 Euro
    10 January 2020
    0 references
    3,314,520.0 Czech koruna
    0 references
    132,580.8 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    1 March 2019
    0 references
    28 February 2022
    0 references
    UVR Mníšek pod Brdy a.s.
    0 references
    0 references
    0 references

    49°52'31.04"N, 14°17'13.02"E
    0 references
    25210
    0 references
    Projekt navazuje na projekt CZ.03.1.51/0.0/0.0/15_035/0001918 Dětská skupina_UVR Mníšek pod Brdy a.s., podpořený z výzvy OP Z č. 03_15_035. Adresa místa provozu DS je Pražská 600, ÚVR Mníšek pod Brdy, 252 10 Mníšek pod Brdy. Jedná se o podnikovou DS s kapacitou 10 míst. Hlavní prostor DS má 134,3 m2, hygienické a provozní zázemí DS je na ploše 59,8 m2. DS má vlastní vchod z atria hl. budovy. Součástí DS je zahrada. Harmonogram projektu je 1. 3. 2019 - 28. 2. 2022, tedy provoz v délce 36 měsíců. (Czech)
    0 references
    The project follows the project CZ.03.1.51/0.0/0.0/15_035/0001918 Children’s group_UVR Mníšek pod Brdy a.s., supported by OP Z No. 03_15_035. Address of the place of operation DS is Pražská 600, Úvr Mníšek pod Brdy, 252 10 Mníšek pod Brdy. It is a company DS with a capacity of 10 seats. The main DS space has 134.3 m², the hygienic and operational background of the DS is on an area of 59.8 m². DS has its own entrance from the atrium of the capital building. Part of the DS is a garden. The project schedule is 1. 3. IT’S A 2019-28. 2. 2022, i.e. an operation of 36 months. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.03.1.51/0.0/0.0/19_101/0011153
    0 references