Insulation of the production hall (Q15447): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed an Item: Change because item Q214247 was merged with Q4870) |
||
Property / contained in NUTS | Property / contained in NUTS | ||
Revision as of 21:41, 27 December 2020
Project Q15447 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Insulation of the production hall |
Project Q15447 in Czech Republic |
Statements
800,000.0 Czech koruna
0 references
2,000,000.0 Czech koruna
0 references
40 percent
0 references
28 August 2017
0 references
31 December 2017
0 references
IKTUS, s. r. o.
0 references
79316
0 references
Cílem projektu je snížení energetických ztrát obálkou objektu, snížení energetické náročnosti budovy za účelem ekonomické úspory při provozu výrobní haly a snížení negativního dopadu na životní prostředí . a. (Czech)
0 references
The aim of the project is to reduce energy losses by the envelope of the building, to reduce the energy performance of the building for economic savings in the operation of the production hall and to reduce the negative impact on the environment. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/15_010/0000928
0 references