Construction of biomass resources in the area of Infini a.s. (Q16567): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed an Item: Change because item Q214247 was merged with Q4870) |
||
Property / contained in NUTS | Property / contained in NUTS | ||
Revision as of 21:57, 27 December 2020
Project Q16567 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of biomass resources in the area of Infini a.s. |
Project Q16567 in Czech Republic |
Statements
2,366,131.6 Czech koruna
0 references
5,915,329.0 Czech koruna
0 references
40 percent
0 references
30 April 2018
0 references
10 March 2021
0 references
Infini a.s.
0 references
79501
0 references
V areálu bude vybudován nový zdroj tepelné energie, a to výtopna na biomasu o půdorysných rozměrech 6,2 x 4,2 m. Tato výtopna bude přiléhat k jedné z rekonstruovaných hal a bude zhotovena z ocelových profilů opláštěná sendvičovými panely s izolací. Ve výtopně budou instalovány celkem 2 kotle o tepelném výkonu 1x 110 kW a 1x 150 kWOdvod spalin budou zajišťovat dva prefabrikované nerezové kouřovody s izolací o průměru 250mm. a. (Czech)
0 references
A new source of heat energy will be built in the area, namely a biomass heating plant with ground plan dimensions of 6.2 x 4.2 m. This heating plant will be adjacent to one of the reconstructed halls and will be made of steel profiles covered with sandwich panels with insulation. A total of 2 boilers with a heat output of 1x 110 kW and 1x 150 kW will be installed in the furnace.The exhaust gas pipeline will provide two prefabricated stainless steel flue pipelines with 250 mm insulated insulation. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_101/0014172
0 references