Q74888 (Q74888): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): As part of the project, road II/286 will be reconstructed. The section started in the intravilan village of Jičín at the point of crossing a circular crossroad with the road with II/502 on Revoluční Street and leads in a north direction from the town through municipalities in Valdice and Železnice on the border of the district. The total length of the reconstructed section is about 5.590 Km. The reconstructed section is located on the selected I...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 22:25, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Czech Republic financed by DG Regio |
Statements
83,060,681.84 Czech koruna
0 references
97,718,449.23 Czech koruna
0 references
85.0 percent
0 references
7 September 2015
0 references
30 June 2018
0 references
30 June 2018
0 references
Královéhradecký kraj
0 references
50003
0 references
V rámci projektu bude rekonstruována silnice II/286. Úsek začítá v intravilánu obce Jičín v místě křížení okružní křižovatkou s komunikací s II/502 na ulici Revoluční a vede severním směrem z města přes obce v Valdice a Železnice na hranici okresu. Celková délka rekonstruovaného úseku je cca 5,590 Km. Rekonstruovaný úsek se nachází na vybrané prioritní síti IROP. Realizací projektu dojde ke zvýšení regionální mobility a rozvoji sítě regionální silniční infrastruktury navazující na síť TEN-T. (Czech)
0 references
As part of the project, road II/286 will be reconstructed. The section started in the intravilan village of Jičín at the point of crossing a circular crossroad with the road with II/502 on Revoluční Street and leads in a north direction from the town through municipalities in Valdice and Železnice on the border of the district. The total length of the reconstructed section is about 5.590 Km. The reconstructed section is located on the selected IROP priority network. The implementation of the project will increase regional mobility and the development of the TEN-T regional road infrastructure network. (English)
23 October 2020
0 references
Identifiers
CZ.06.1.42/0.0/0.0/15_002/0001657
0 references