Insulation of apartment house Drobný 540 NMnM (Q75355): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Insulation of apartment house Drobný 540 NMnM

Revision as of 22:17, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Insulation of apartment house Drobný 540 NMnM
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,438,307.99 Czech koruna
    0 references
    57,532.32 Euro
    10 January 2020
    0 references
    3,595,769.98 Czech koruna
    0 references
    143,830.80 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    27 November 2015
    0 references
    31 October 2018
    0 references
    31 October 2018
    0 references
    Město Nové Město na Moravě
    0 references
    0 references

    49°33'58.3"N, 16°4'30.7"E
    0 references
    59231
    0 references
    Zkvalitnění energetické náročnosti dvoupodl.bytového domu s obytným podkrovím, s celkem 20ti byty. Obvodový plášť objektu bude zateplen polystyrenem tl. 140 mm na ploše 463 m2, strop sklepních prostor umístěných v 1.PP pak polystyrenem tl. 100 mm. Stávající krytina a latě budou demontovány, doplní se nadkrokevní izolace, následuje zpětná montáž krytiny. V 1.PP budou vyměněna stávající 2křídlá okna za nová plastová. Úpravami dojde ke snížení stávající spotřeby energie o 103,835 MWh/rok. (Czech)
    0 references
    Improving the energy performance of a two-storey apartment building with a residential attic, with a total of 20 apartments. The perimeter casing of the object will be insulated with polystyrene tl. 140 mm on an area of 463 m², ceiling of cellar spaces located in 1.PP then polystyrene tl. It’s 100 mm. Existing coverings and lashes will be disassembled, super-treatment insulation will be added, followed by retro-assembly of the covering. In the 1stPP, existing 2 wing windows will be replaced with new plastic windows. The modifications will reduce the current energy consumption by 103.835 MWh/year. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.11/0.0/0.0/16_098/0001942
    0 references