JSDH Shektor fire brigade (Q74267): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project is the purchase of a tanker car fire engine for high volume fire-fighting for JSDH Shavorec. The problem of the current technique is its wear. This results in relatively high failure rates and increased maintenance costs. The purchase of a new car car will reduce the costs of maintenance and, at the same time, improve safety and speed in the event of a possible intervention. The tank of the tank to JPO Škvorec will s...) |
(Created claim: summary (P836): The object of the project is the acquisition of a tank car syringe for large-volume extinguishing for JSDH Škvorec. The problem of current technology is its weariness. This results in its relatively high failure and increased maintenance costs. The acquisition of a new tank car will reduce the maintenance costs and at the same time increase safety and speed during possible intervention. By placing the tanker at JPO Škvorec, the arrival time in t...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the acquisition of a tank car syringe for large-volume extinguishing for JSDH Škvorec. The problem of current technology is its weariness. This results in its relatively high failure and increased maintenance costs. The acquisition of a new tank car will reduce the maintenance costs and at the same time increase safety and speed during possible intervention. By placing the tanker at JPO Škvorec, the arrival time in the extinguishing circuit will be shortened. (English) | |||||||||||||||
Property / summary: The object of the project is the acquisition of a tank car syringe for large-volume extinguishing for JSDH Škvorec. The problem of current technology is its weariness. This results in its relatively high failure and increased maintenance costs. The acquisition of a new tank car will reduce the maintenance costs and at the same time increase safety and speed during possible intervention. By placing the tanker at JPO Škvorec, the arrival time in the extinguishing circuit will be shortened. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the acquisition of a tank car syringe for large-volume extinguishing for JSDH Škvorec. The problem of current technology is its weariness. This results in its relatively high failure and increased maintenance costs. The acquisition of a new tank car will reduce the maintenance costs and at the same time increase safety and speed during possible intervention. By placing the tanker at JPO Škvorec, the arrival time in the extinguishing circuit will be shortened. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 22:10, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | JSDH Shektor fire brigade |
Project in Czech Republic financed by DG Regio |
Statements
6,984,861.4 Czech koruna
0 references
8,217,484.0 Czech koruna
0 references
85 percent
0 references
19 February 2016
0 references
27 September 2017
0 references
15 December 2017
0 references
MĚSTYS ŠKVOREC
0 references
25083
0 references
Předmětem projektu je pořízení cisternové automobilové stříkačky pro velkoobjemové hašení pro JSDH Škvorec. Problémem současné techniky je její opotřebovanost. Z toho vyplývá její poměrně vysoká poruchovost a zvýšené náklady na údržbu. Pořízením nového cisternového automobilu dojde ke snížení nákladů na údržbu a zároveň ke zvýšení bezpečnosti a rychlosti při případném zásahu. Umístěním cisterny u JPO Škvorec dojde ke zkrácení dojezdových časů v hasebním obvodu. (Czech)
0 references
The object of the project is the acquisition of a tank car syringe for large-volume extinguishing for JSDH Škvorec. The problem of current technology is its weariness. This results in its relatively high failure and increased maintenance costs. The acquisition of a new tank car will reduce the maintenance costs and at the same time increase safety and speed during possible intervention. By placing the tanker at JPO Škvorec, the arrival time in the extinguishing circuit will be shortened. (English)
23 October 2020
0 references
Identifiers
CZ.06.1.23/0.0/0.0/15_017/0000996
0 references