Regeneration of household apartment 7, Rhine river (Q75322): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project content is to reduce the energy performance of the building stock by 14 dwellings to be located on ul. Ring-7 on the Rhine and was built more than 80 years ago. The project will include the insulation of the building facades of the house by the contact warm up, the insulation of a skirting board of extruded polystyrene, the insulation of subsearching above the basement, the insulation of the ground floor, the fitting out of new cel...) |
(Created claim: summary (P836): The content of the project is to reduce the energy performance of the building of an apartment building with 14 units, which is located on ul. Circular 7 in Rýmařov and was built more than 80 years ago. As part of the project, the facade of the house will be insulated with a contact insulation system, thermal insulation of the plinth with extruded polystyrene, insulation of ceilings above the basement, thermal insulation of the ground floor, ins...) |
||||||||||||||
Property / summary | |||||||||||||||
The content of the project is to reduce the energy performance of the building of an apartment building with 14 units, which is located on ul. Circular 7 in Rýmařov and was built more than 80 years ago. As part of the project, the facade of the house will be insulated with a contact insulation system, thermal insulation of the plinth with extruded polystyrene, insulation of ceilings above the basement, thermal insulation of the ground floor, installation of new cellar windows and balcony doors (to replace all tenants’ windows with new plastics occurred in the past). (English) | |||||||||||||||
Property / summary: The content of the project is to reduce the energy performance of the building of an apartment building with 14 units, which is located on ul. Circular 7 in Rýmařov and was built more than 80 years ago. As part of the project, the facade of the house will be insulated with a contact insulation system, thermal insulation of the plinth with extruded polystyrene, insulation of ceilings above the basement, thermal insulation of the ground floor, installation of new cellar windows and balcony doors (to replace all tenants’ windows with new plastics occurred in the past). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The content of the project is to reduce the energy performance of the building of an apartment building with 14 units, which is located on ul. Circular 7 in Rýmařov and was built more than 80 years ago. As part of the project, the facade of the house will be insulated with a contact insulation system, thermal insulation of the plinth with extruded polystyrene, insulation of ceilings above the basement, thermal insulation of the ground floor, installation of new cellar windows and balcony doors (to replace all tenants’ windows with new plastics occurred in the past). (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 22:09, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Regeneration of household apartment 7, Rhine river |
Project in Czech Republic financed by DG Regio |
Statements
1,127,596.5 Czech koruna
0 references
3,758,655.0 Czech koruna
0 references
30 percent
0 references
19 May 2016
0 references
31 December 2017
0 references
31 December 2017
0 references
Město Rýmařov
0 references
79501
0 references
Obsahem projektu je snížení energetické náročnosti budovy bytového domu o 14 bytových jednotkách, který se nachází na ul. Okružní 7 v Rýmařově a byl postaven před více než 80-ti lety. V rámci projektu bude provedeno zateplení fasády domu kontaktním zateplovacím systémem, zateplení soklu extrudovaným polystyrénem, zateplení podhledů nad suterénem, zateplení podlahy půdy, osazení nových sklepních oken a balkónových dveří (k výměně veškerých oken nájemníků za nové plastové došlo již v minulosti). (Czech)
0 references
The content of the project is to reduce the energy performance of the building of an apartment building with 14 units, which is located on ul. Circular 7 in Rýmařov and was built more than 80 years ago. As part of the project, the facade of the house will be insulated with a contact insulation system, thermal insulation of the plinth with extruded polystyrene, insulation of ceilings above the basement, thermal insulation of the ground floor, installation of new cellar windows and balcony doors (to replace all tenants’ windows with new plastics occurred in the past). (English)
23 October 2020
0 references
Identifiers
CZ.06.2.11/0.0/0.0/16_098/0001839
0 references