D1 Modernisation — Branch 06, EXIT 49 folders — EXIT 56 Soutice_1 (Q72394): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is the modernisation of the D1 motorway on the section of the Dove — Soutice (km 48,590-56,300) of 7.710 km. The actual modernisation consists of the extension to category D 28 and 2, respectively, of road tracks with a width of reinforcement of 11.5 m and an improvement in the construction of the technical condition of the motorway. These adjustments will contribute to substantially increase the safety and flow of t...)
(‎Created claim: summary (P836): The object of the project is modernisation of the D1 motorway in the section Psáře – Soutice (km 48.590-56.300) in the length of 7.710 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well...)
Property / summary
 
The object of the project is modernisation of the D1 motorway in the section Psáře – Soutice (km 48.590-56.300) in the length of 7.710 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English)
Property / summary: The object of the project is modernisation of the D1 motorway in the section Psáře – Soutice (km 48.590-56.300) in the length of 7.710 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English) / rank
 
Normal rank
Property / summary: The object of the project is modernisation of the D1 motorway in the section Psáře – Soutice (km 48.590-56.300) in the length of 7.710 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:43, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
D1 Modernisation — Branch 06, EXIT 49 folders — EXIT 56 Soutice_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    967,938,626.25 Czech koruna
    0 references
    38,717,545.05 Euro
    10 January 2020
    0 references
    1,236,966,463.0 Czech koruna
    0 references
    49,478,658.52 Euro
    10 January 2020
    0 references
    78.25 percent
    0 references
    15 January 2016
    0 references
    30 June 2018
    0 references
    30 June 2018
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je modernizace dálnice D1 v úseku Psáře - Soutice (km 48,590 - 56,300) v délce 7,710 km. Vlastní modernizace spočívá v rozšíření na kategorii D 28, resp. 2 jízdní pásy o šířce zpevnění 11,5 m a zlepšení stavebně technického stavu dálnice. Tyto úpravy přispějí k podstatnému zvýšení bezpečnosti a plynulosti provozu na této značně zatížené komunikaci a rovněž i k oddálení běžných oprav. (Czech)
    0 references
    The object of the project is modernisation of the D1 motorway in the section Psáře – Soutice (km 48.590-56.300) in the length of 7.710 km. The actual modernisation consists of extending to category D 28 or 2 belts with a reinforced width of 11.5 m and improving the constructional state of the motorway. These modifications will contribute to a substantial increase in safety and continuity of operation on this heavily loaded communication as well as delaying normal repairs. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.2.39/0.0/0.0/15_003/0000039
    0 references