Improvement of the energy performance of the PCA Chelytic 2/II, Třeboň (Q73879): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The “Třeboňský kapr” project deals with the energy-saving renovation of a public building, the nursing home. the project aims to reduce final energy consumption and to reduce the consumption of non-renewable primary energy. among the main activities of the project are: — insulation of the building envelope, — replacement of the building envelope, — replacement of heat sources for heating and preparation of hot water. the project does not const...)
(‎Created claim: summary (P836): The project aims to reduce final energy consumption and reduce the consumption of non-renewable primary energy.The main activities of the project include:- insulation of the building’s outer shell,- replacement of hole fillings,- exchange of heat source for heating and preparation of hot water.The project does not create public support (for more details see chapter What are the risks of the project?)., translated_summary)
Property / summary
 
The project aims to reduce final energy consumption and reduce the consumption of non-renewable primary energy.The main activities of the project include:- insulation of the building’s outer shell,- replacement of hole fillings,- exchange of heat source for heating and preparation of hot water.The project does not create public support (for more details see chapter What are the risks of the project?). (English)
Property / summary: The project aims to reduce final energy consumption and reduce the consumption of non-renewable primary energy.The main activities of the project include:- insulation of the building’s outer shell,- replacement of hole fillings,- exchange of heat source for heating and preparation of hot water.The project does not create public support (for more details see chapter What are the risks of the project?). (English) / rank
 
Normal rank
Property / summary: The project aims to reduce final energy consumption and reduce the consumption of non-renewable primary energy.The main activities of the project include:- insulation of the building’s outer shell,- replacement of hole fillings,- exchange of heat source for heating and preparation of hot water.The project does not create public support (for more details see chapter What are the risks of the project?). (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:32, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Improvement of the energy performance of the PCA Chelytic 2/II, Třeboň
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    6,100,549.5 Czech koruna
    0 references
    244,021.98 Euro
    10 January 2020
    0 references
    12,201,099.0 Czech koruna
    0 references
    488,043.96 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    15 October 2020
    0 references
    Město Třeboň
    0 references
    0 references
    0 references

    49°1'12.61"N, 14°45'44.53"E
    0 references
    37901
    0 references
    Projekt Města Třeboň řeší energeticky úspornou renovaci veřejné budovy, domu s pečovatelskou službou.Cílem projektu je snížit konečnou spotřebu energie a snížit spotřebu neobnovitelné primární energie.Mezi hlavní aktivity projektu patří:- zateplení obvodového pláště budovy,- výměna otvorových výplní,- výměna zdroje tepla pro vytápění a přípravu teplé užitkové vody.Projekt nezakládá veřejnou podporu (blíže viz kapitola Jaká existují rizika projektu?). (Czech)
    0 references
    The project aims to reduce final energy consumption and reduce the consumption of non-renewable primary energy.The main activities of the project include:- insulation of the building’s outer shell,- replacement of hole fillings,- exchange of heat source for heating and preparation of hot water.The project does not create public support (for more details see chapter What are the risks of the project?). (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/18_100/0009272
    0 references