Reducing the energy intensity of the Č.p. 78 Bukovice — Municipal office and fire armouries (Q73814): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project is to implement complex technical measures aimed at reducing the energy performance of public building No 78 (General office and fire arms) in the municipality of Bukovice. The measures consist of insulation of the envelope of the building, including the filling of openings (windows and doors including fire fighting in fire armouries) and hot roof insulation. The implementation of the project will benefit the reducti...) |
(Created claim: summary (P836): The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of public building No. 78 (General Office and Fire Armory) in the municipality of Bukovice. The measures consist of insulating the building envelope, including replacement of the opening fillings (windows and doors including section doors in the fire armory) and roof insulation. The project will benefit from reducing energy...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of public building No. 78 (General Office and Fire Armory) in the municipality of Bukovice. The measures consist of insulating the building envelope, including replacement of the opening fillings (windows and doors including section doors in the fire armory) and roof insulation. The project will benefit from reducing energy consumption and related reductions in pollutant emissions. (English) | |||||||||||||||
Property / summary: The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of public building No. 78 (General Office and Fire Armory) in the municipality of Bukovice. The measures consist of insulating the building envelope, including replacement of the opening fillings (windows and doors including section doors in the fire armory) and roof insulation. The project will benefit from reducing energy consumption and related reductions in pollutant emissions. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of public building No. 78 (General Office and Fire Armory) in the municipality of Bukovice. The measures consist of insulating the building envelope, including replacement of the opening fillings (windows and doors including section doors in the fire armory) and roof insulation. The project will benefit from reducing energy consumption and related reductions in pollutant emissions. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:31, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy intensity of the Č.p. 78 Bukovice — Municipal office and fire armouries |
Project in Czech Republic financed by DG Regio |
Statements
579,318.0 Czech koruna
0 references
1,448,295.0 Czech koruna
0 references
40 percent
0 references
28 February 2021
0 references
OBEC BUKOVICE
0 references
54954
0 references
Předmětem projektu je provedení komplexních stavebně technických opatření s cílem snížení energetické náročnosti veřejné budovy č.p 78 (Obecní úřad a požární zbrojnice) v obci Bukovice. Opatření spočívají v provedení zateplení obálky budovy, včetně výměny výplní otvorů (oken i dveří včetně sekčních vrat v požární zbrojnici) a zateplení střechy. Přínosem realizace projektu bude snížení spotřeby energií a s tím související snížení emisí znečišťujících látek. (Czech)
0 references
The object of the project is to implement complex construction technical measures aimed at reducing the energy performance of public building No. 78 (General Office and Fire Armory) in the municipality of Bukovice. The measures consist of insulating the building envelope, including replacement of the opening fillings (windows and doors including section doors in the fire armory) and roof insulation. The project will benefit from reducing energy consumption and related reductions in pollutant emissions. (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/18_100/0009133
0 references