Doz Rokycana (excl.) — Cheb (out of) _1 (Q72242): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): As part of the project submitted, there will be a section of Rokycany (outside) — Plzen — Cheb (outside) to replace the current segment control by a system of remote controls of the signalling, communication and power equipment and other related technology systems. Individual plants and technologies are located in railway stations and stops, and they will be remotely controlled after the realisation of the works from the central control room i...)
(‎Created claim: summary (P836): Within the submitted project, the line section Rokycany (outside) – Plzeň – Cheb (outside) will replace the existing section control system of remote control of signalling, communication and heavy current equipment and other related technologies. Individual equipment and technologies are located in railway stations and stops and after the construction they will be remotely controlled from the central dispatching station located in Prague., trans...)
Property / summary
 
Within the submitted project, the line section Rokycany (outside) – Plzeň – Cheb (outside) will replace the existing section control system of remote control of signalling, communication and heavy current equipment and other related technologies. Individual equipment and technologies are located in railway stations and stops and after the construction they will be remotely controlled from the central dispatching station located in Prague. (English)
Property / summary: Within the submitted project, the line section Rokycany (outside) – Plzeň – Cheb (outside) will replace the existing section control system of remote control of signalling, communication and heavy current equipment and other related technologies. Individual equipment and technologies are located in railway stations and stops and after the construction they will be remotely controlled from the central dispatching station located in Prague. (English) / rank
 
Normal rank
Property / summary: Within the submitted project, the line section Rokycany (outside) – Plzeň – Cheb (outside) will replace the existing section control system of remote control of signalling, communication and heavy current equipment and other related technologies. Individual equipment and technologies are located in railway stations and stops and after the construction they will be remotely controlled from the central dispatching station located in Prague. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:23, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Doz Rokycana (excl.) — Cheb (out of) _1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    167,313,646.4 Czech koruna
    0 references
    6,692,545.86 Euro
    10 January 2020
    0 references
    196,839,584.0 Czech koruna
    0 references
    7,873,583.36 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    1 January 2019
    0 references
    14 December 2020
    0 references
    Správa železniční dopravní cesty, státní organizace
    0 references
    0 references

    50°5'20.22"N, 14°25'13.04"E
    0 references

    50°5'7.01"N, 14°25'23.81"E
    0 references
    11000
    0 references
    V rámci předloženého projektu dojde na traťovém úseku Rokycany (mimo) - Plzeň - Cheb (mimo) k náhradě stávajícího úsekového řízení systémem dálkového ovládání zabezpečovacího, sdělovacího a silnoproudého zařízení a dalších návazných technologií. Jednotlivá zařízení a technologie jsou umístěna v železničních stanicích a zastávkách a po realizaci stavby budou dálkově ovládána z centrálního dispečerského pracoviště umístěného v Praze. (Czech)
    0 references
    Within the submitted project, the line section Rokycany (outside) – Plzeň – Cheb (outside) will replace the existing section control system of remote control of signalling, communication and heavy current equipment and other related technologies. Individual equipment and technologies are located in railway stations and stops and after the construction they will be remotely controlled from the central dispatching station located in Prague. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.1.41/0.0/0.0/15_001/0000159
    0 references