Energy savings of the kindergarten and the practical school of the Jelid School (Q73587): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The insulation of the building envelope, the insulation of the roof, the replacement of the roof filling, the installation of energy recovery/recovery and the boiler room with the heating system that will be cleared will be carried out. The implementation will be carried out on OJ 1131/1, 538/1, 538/20, 538/25, 538/57, 538/60, cadastral district. Jevíčko — Letters, No 586 of the Jelid, remove_old_english_translation) |
(Created claim: summary (P836): Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and boiler room with heating system, which will be regulated. The implementation will take place at p. no. 1131/1, p. no. 538/1, 538/20, 538/25, 538/57, 538/60, k.ú. Jevíčko – Suburban, No. 586 Jevíčko, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and boiler room with heating system, which will be regulated. The implementation will take place at p. no. 1131/1, p. no. 538/1, 538/20, 538/25, 538/57, 538/60, k.ú. Jevíčko – Suburban, No. 586 Jevíčko (English) | |||||||||||||||
Property / summary: Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and boiler room with heating system, which will be regulated. The implementation will take place at p. no. 1131/1, p. no. 538/1, 538/20, 538/25, 538/57, 538/60, k.ú. Jevíčko – Suburban, No. 586 Jevíčko (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and boiler room with heating system, which will be regulated. The implementation will take place at p. no. 1131/1, p. no. 538/1, 538/20, 538/25, 538/57, 538/60, k.ú. Jevíčko – Suburban, No. 586 Jevíčko (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:22, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy savings of the kindergarten and the practical school of the Jelid School |
Project in Czech Republic financed by DG Regio |
Statements
4,873,810.88 Czech koruna
0 references
12,184,527.2 Czech koruna
0 references
40 percent
0 references
20 June 2018
0 references
12 May 2020
0 references
Město Jevíčko
0 references
56943
0 references
Bude realizováno zateplení obvodového pláště budovy, zateplení střechy, výměna otvorových výplní, instalace vzduchotechniky s rekuperací a kotelna s otopnou soustavou, která bude vyregulována. Realizace proběhne na p.č. st. 1131/1, p.č. 538/1, 538/20, 538/25, 538/57, 538/60, k.ú. Jevíčko - Předměstí, č.p. 586 Jevíčko (Czech)
0 references
Insulation of the building’s outer shell, roof insulation, replacement of hole fillings, installation of air conditioning with recuperation and boiler room with heating system, which will be regulated. The implementation will take place at p. no. 1131/1, p. no. 538/1, 538/20, 538/25, 538/57, 538/60, k.ú. Jevíčko – Suburban, No. 586 Jevíčko (English)
23 October 2020
0 references
Identifiers
CZ.05.5.18/0.0/0.0/17_070/0006809
0 references