(Removed claim: summary (P836): Construction is at km around 77,526-86,486 line Brno-Židenice — Havlíčkův Brod. This is a national line included in the TEN-T line system by building renovation and upgrading of the existing footprint. The area concerned by the construction is characterised by the nature of the runway with the existing twin track. The line is passing through the land with land, meadows and forest land. Alternatively, the body of the track is to be cut and emba...) |
(Created claim: summary (P836): The construction is located on km 77.526-86.486 of the line Brno-Židenice – Havlíčkův Brod. It is a national line included in the TEN-T line system. Reconstruction and modernisation of the section in the current track will be carried out by the construction. The area concerned by the construction has the character of railway land with an existing double-track line. The line passes through the area with field, meadow and forest land. Alternately,...) |
||||||||||||||
Property / summary | |||||||||||||||
The construction is located on km 77.526-86.486 of the line Brno-Židenice – Havlíčkův Brod. It is a national line included in the TEN-T line system. Reconstruction and modernisation of the section in the current track will be carried out by the construction. The area concerned by the construction has the character of railway land with an existing double-track line. The line passes through the area with field, meadow and forest land. Alternately, the body of the track is located in the notch and embankment. (English) | |||||||||||||||
Property / summary: The construction is located on km 77.526-86.486 of the line Brno-Židenice – Havlíčkův Brod. It is a national line included in the TEN-T line system. Reconstruction and modernisation of the section in the current track will be carried out by the construction. The area concerned by the construction has the character of railway land with an existing double-track line. The line passes through the area with field, meadow and forest land. Alternately, the body of the track is located in the notch and embankment. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The construction is located on km 77.526-86.486 of the line Brno-Židenice – Havlíčkův Brod. It is a national line included in the TEN-T line system. Reconstruction and modernisation of the section in the current track will be carried out by the construction. The area concerned by the construction has the character of railway land with an existing double-track line. The line passes through the area with field, meadow and forest land. Alternately, the body of the track is located in the notch and embankment. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 21:16, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of track No 1 and 2 Ostrov nad Oslavou — Žďár nad Sazarach_1 |
Project in Czech Republic financed by DG Regio |
Statements
762,807,511.07 Czech koruna
0 references
986,718,638.0 Czech koruna
0 references
77.31 percent
0 references
21 March 2016
0 references
20 April 2017
0 references
20 April 2017
0 references
Správa železniční dopravní cesty, státní organizace
0 references
11000
0 references
Stavba se nachází v km cca 77,526-86,486 trati Brno-Židenice - Havlíčkův Brod. Jedná se o celostátní trať zahrnutou do systému tratí TEN-T. Stavbou bude provedena rekonstrukce a modernizace úseku ve stávající stopě. Území dotčené stavbou má charakter pozemků dráhy se stávající dvoukolejnou trati. Trať prochází územím s polními, lučními i lesními pozemky. Střídavě se těleso dráhy nachází v zářezu a náspu. (Czech)
0 references
The construction is located on km 77.526-86.486 of the line Brno-Židenice – Havlíčkův Brod. It is a national line included in the TEN-T line system. Reconstruction and modernisation of the section in the current track will be carried out by the construction. The area concerned by the construction has the character of railway land with an existing double-track line. The line passes through the area with field, meadow and forest land. Alternately, the body of the track is located in the notch and embankment. (English)
23 October 2020
0 references
Identifiers
CZ.04.1.41/0.0/0.0/15_001/0000019
0 references