Q71964 (Q71964): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The building of the Opočno Primary School no. 313 consists of three construction units – the original building with an extension, a classroom pavilion and a gymnasium. The building is insulated from 2011, the windows are replaced. The original heating consists mainly of electric storage stoves, to a lesser extent by hot water heating from the accumulation electric boiler room, hot water is heated by electric heating. The investor’s effort is to...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Change in the heating route of the basic school No 313 in Odessa

Revision as of 20:57, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,020,525.82 Czech koruna
    0 references
    80,821.03 Euro
    10 January 2020
    0 references
    5,051,314.57 Czech koruna
    0 references
    202,052.58 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    3 July 2017
    0 references
    28 June 2019
    0 references
    30 June 2019
    0 references
    Město Opočno
    0 references
    0 references
    0 references

    50°16'8.40"N, 16°6'30.02"E
    0 references
    51773
    0 references
    Budovu Základní školy Opočno, č. p. 313 tvoří tři konstrukční celky - původní budova s přístavbou, učebnový pavilon a tělocvična. Budova je z r. 2011 zateplena, okna vyměněna. Původní vytápění je tvořeno především elektrickými akumulačními kamny, v menší míře teplovodním vytápěním z akumulační elektrokotelny, teplá voda je ohřívána elektrickým ohřevem. Snahou investora je změna způsobu tohoto zastaralého a ekonomicky nákladného způsobu vytápění a přechod na OZE - el. tepelné čerpadlo. (Czech)
    0 references
    The building of the Opočno Primary School no. 313 consists of three construction units – the original building with an extension, a classroom pavilion and a gymnasium. The building is insulated from 2011, the windows are replaced. The original heating consists mainly of electric storage stoves, to a lesser extent by hot water heating from the accumulation electric boiler room, hot water is heated by electric heating. The investor’s effort is to change the way of this outdated and economically expensive way of heating and switching to renewables – electric heat pump. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001516
    0 references