Q71858 (Q71858): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project deals with insulation of the building envelope and exchange of heating source of the cultural house in Nisovice in Strakonice district. The Cultural House is located on the building plot st. 24/2. These include insulation of perimeter walls, exchange of windows and doors of the boiler room (other fillings are already PVC) and insulation of flat roofs. The completely unsatisfactory fuel source for diesel will be replaced with an autom...)
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
label / enlabel / en
Reducing the energy — culture House, Nišovice

Revision as of 20:48, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    914,178.4 Czech koruna
    0 references
    36,567.14 Euro
    10 January 2020
    0 references
    2,285,446.0 Czech koruna
    0 references
    91,417.84 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    22 May 2017
    0 references
    28 February 2019
    0 references
    Obec Nišovice
    0 references
    0 references
    0 references

    49°10'16.54"N, 13°53'45.78"E
    0 references
    38701
    0 references
    Projekt řeší zateplení obálky budovy a výměnu topného zdroje kulturního domu v Nisovicích v okrese Strakonice. Kulturní dům se nachází na stavebním pozemku st. 24/2. Jedná se o zateplení obvodových stěn, výměnu okna a dveří kotelny (ostatní výplně jsou již PVC) a zateplení plochých střech. Zcela nevyhovující topný zdroj na naftu bude vyměněn za automatický peletový kotel. Prostor sálu vytápěn teplovzdušně. (Czech)
    0 references
    The project deals with insulation of the building envelope and exchange of heating source of the cultural house in Nisovice in Strakonice district. The Cultural House is located on the building plot st. 24/2. These include insulation of perimeter walls, exchange of windows and doors of the boiler room (other fillings are already PVC) and insulation of flat roofs. The completely unsatisfactory fuel source for diesel will be replaced with an automatic pellet boiler. Space of the hall heated in hot air. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001449
    0 references