(Removed claim: summary (P836): The purpose of the project is to revitalise the water area and extend it along with a revitalisation of the surrounding bed of the stream (revital.nivy). The construction works in the project are structured around the following sites: SO 1: Wetland and/or revitalisation of the stream — likeness to the SO 1.1. Construction work, SO 1.2. Greening. The SO 2- Towards the greening of the wider wetland area is not the subject of the application, it...) |
(Created claim: summary (P836): The purpose of the project is to revitalise the water area and extend it together with the revitalisation of the adjacent stream (revital.niva). The building buildings in the project are structured into the following buildings: SO 1: Wetland and flow revitalisation – subobject SO 1.1. Construction work, SO 1.2. The greenery. Building SO 2- Enabling the wider surroundings of the wetland, is not the subject of the request, will be financed by the...) |
||||||||||||||
Property / summary | |||||||||||||||
The purpose of the project is to revitalise the water area and extend it together with the revitalisation of the adjacent stream (revital.niva). The building buildings in the project are structured into the following buildings: SO 1: Wetland and flow revitalisation – subobject SO 1.1. Construction work, SO 1.2. The greenery. Building SO 2- Enabling the wider surroundings of the wetland, is not the subject of the request, will be financed by the municipality. By revitalising the flow, the trough route will loosen, significantly increase the biodiversity of the territory and greater retention of water in the given landscape. (English) | |||||||||||||||
Property / summary: The purpose of the project is to revitalise the water area and extend it together with the revitalisation of the adjacent stream (revital.niva). The building buildings in the project are structured into the following buildings: SO 1: Wetland and flow revitalisation – subobject SO 1.1. Construction work, SO 1.2. The greenery. Building SO 2- Enabling the wider surroundings of the wetland, is not the subject of the request, will be financed by the municipality. By revitalising the flow, the trough route will loosen, significantly increase the biodiversity of the territory and greater retention of water in the given landscape. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The purpose of the project is to revitalise the water area and extend it together with the revitalisation of the adjacent stream (revital.niva). The building buildings in the project are structured into the following buildings: SO 1: Wetland and flow revitalisation – subobject SO 1.1. Construction work, SO 1.2. The greenery. Building SO 2- Enabling the wider surroundings of the wetland, is not the subject of the request, will be financed by the municipality. By revitalising the flow, the trough route will loosen, significantly increase the biodiversity of the territory and greater retention of water in the given landscape. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 20:33, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Revitalisation of Tupská týse |
Project in Czech Republic financed by DG Regio |
Statements
2,873,306.26 Czech koruna
0 references
2,873,306.26 Czech koruna
0 references
100 percent
0 references
3 September 2018
0 references
31 August 2020
0 references
Obec Tupesy
0 references
68707
0 references
Účelem projektu je revitalizace vodní plochy a její rozšíření společně s revitalizací přilehlého koryta toku(revital.nivy) . Stavební objekty v projektu jsou strukturovány do těchto objektů: SO 1: Mokřad a revitalizace toku - podobjekt SO 1.1. Stavební práce, SO 1.2. Ozelenění. Objekt SO 2- Ozelenění širšího okolí mokřadu, není předmětem žádosti , bude financováno obcí. Revitalizací toku dojde k rozvolnění trasy koryta, k výraznému zvýšení biodiverzity území a větší retenci vody v dané krajině. (Czech)
0 references
The purpose of the project is to revitalise the water area and extend it together with the revitalisation of the adjacent stream (revital.niva). The building buildings in the project are structured into the following buildings: SO 1: Wetland and flow revitalisation – subobject SO 1.1. Construction work, SO 1.2. The greenery. Building SO 2- Enabling the wider surroundings of the wetland, is not the subject of the request, will be financed by the municipality. By revitalising the flow, the trough route will loosen, significantly increase the biodiversity of the territory and greater retention of water in the given landscape. (English)
23 October 2020
0 references
Identifiers
CZ.05.4.27/0.0/0.0/18_093/0007999
0 references