Construction of works on p. 1356 of the cadastral district. Mirotice (Q71583): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project’s intention is to build water areas in the form of ponds (p. 1356 in the cadastral district of the cadastral district. Mirotice) will act as a water, protectionism and landscape guard. The planned construction works meet the intended objectives, namely the increase in the retention capacity of the site and the creation of a suitable habitat for more rare plants and animals., remove_old_english_translation) |
(Created claim: summary (P836): The project plan deals with the construction of water area in the form of a pool (Land p. no. 1356 in k.ú. Mirotice), which will act as water management, protectionist and landscape forming. The planned construction of the pool meets the intended objectives, namely increasing the retention capacity of the site and the creation of a suitable biotope for rarer species of plants and fauna.The planned action will contribute to improving the water re...) |
||||||||||||||
Property / summary | |||||||||||||||
The project plan deals with the construction of water area in the form of a pool (Land p. no. 1356 in k.ú. Mirotice), which will act as water management, protectionist and landscape forming. The planned construction of the pool meets the intended objectives, namely increasing the retention capacity of the site and the creation of a suitable biotope for rarer species of plants and fauna.The planned action will contribute to improving the water regime of heavily degraded areas in the location of the White brooks by creating a medium-sized flow basin. (English) | |||||||||||||||
Property / summary: The project plan deals with the construction of water area in the form of a pool (Land p. no. 1356 in k.ú. Mirotice), which will act as water management, protectionist and landscape forming. The planned construction of the pool meets the intended objectives, namely increasing the retention capacity of the site and the creation of a suitable biotope for rarer species of plants and fauna.The planned action will contribute to improving the water regime of heavily degraded areas in the location of the White brooks by creating a medium-sized flow basin. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project plan deals with the construction of water area in the form of a pool (Land p. no. 1356 in k.ú. Mirotice), which will act as water management, protectionist and landscape forming. The planned construction of the pool meets the intended objectives, namely increasing the retention capacity of the site and the creation of a suitable biotope for rarer species of plants and fauna.The planned action will contribute to improving the water regime of heavily degraded areas in the location of the White brooks by creating a medium-sized flow basin. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 20:31, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of works on p. 1356 of the cadastral district. Mirotice |
Project in Czech Republic financed by DG Regio |
Statements
630,139.61 Czech koruna
0 references
630,139.61 Czech koruna
0 references
100 percent
0 references
31 January 2021
0 references
xxx
0 references
39804
0 references
Záměr projektu řeší výstavbu vodní plochy v podobě tůně (pozemková p. č. 1356 v k.ú. Mirotice), která bude zastávat funkci vodohospodářskou, ochranářskou a krajinotvornou. Plánovaná výstavba tůně splňuje zamýšlené cíle, a to zvýšení retenční schopnosti lokality a vznik vhodného biotopu pro vzácnější druhy rostlin a živočichů.Přínosem plánované akce bude zlepšení vodního režimu silně degradovaných ploch v lokalitě Bílé potoky, a to tvorbou středně velké průtočné tůně. (Czech)
0 references
The project plan deals with the construction of water area in the form of a pool (Land p. no. 1356 in k.ú. Mirotice), which will act as water management, protectionist and landscape forming. The planned construction of the pool meets the intended objectives, namely increasing the retention capacity of the site and the creation of a suitable biotope for rarer species of plants and fauna.The planned action will contribute to improving the water regime of heavily degraded areas in the location of the White brooks by creating a medium-sized flow basin. (English)
23 October 2020
0 references
Identifiers
CZ.05.4.27/0.0/0.0/18_108/0008969
0 references